Remote Programming (Figure 7-6); Power Failure Transfer; Figure - Samsung DCS-816 Installation Manual

Hide thumbs Also See for DCS-816:
Table of Contents

Advertisement

SAMSUNG
DCS-816

7.7 Remote Programming (Figure 7-6)

To remotely program the system, connect a customer-provided modem to one of the serial
interface connectors (DB9) on an SIO option card (Figures 3-1 and 3-2), and to an unused SLT
port. Before connecting the modem, ensure that the system power is turned OFF. Any external
battery, if installed, should also be removed. Otherwise, the system as well as the modem may be
severely damaged.
SIO BOARD (DTE DB9)
PIN CONNECTIONS TO MODEM
Use a pin-to-pin RS232C cable. Only pins 2, 3, 4, 5, 6, 7 and 8 are required. When the modem
needs to be more than 5 metres away from the system, shielded computer cable is required.
Connect a male DB9 connector to the SIO card and then connect a connector that meets the
requirement of the modem to the other end. The cable must not exceed 100 metres.

7.8 Power Failure Transfer

If the system loses AC power and has no external battery, the two (2) analogue trunk lines on the
base board are automatically switched to the last two (2) stations.
st
1
nd
2
Technical Manuals Online! - http://www.tech-man.com
RXD (2)
TXD (3)
GND (5)
DCD (1)
RTS (7)
DTR (4)
DSR (6)
Trunk line
to
Trunk line
to
² THE SYSTEM POWER SHOULD BE REMOVED
BEFORE CONNECTING THE DEVICE
² CONNECT A PC EQUIPPED WITH PCMMC TO
ONE OF THE DB9 CONNECTORS ON AN SIO
BOARD
Station 15 (SLT)
Station 16 (SLT)
7-6
MODEM (DCE DB25)
TXD (3)
RXD (2)
GND (7)
DCD (1)
CTS (4)
DTR (20)
DSR (6)

FIGURE 7-6

Installation
March 1999

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents