NEC Storage Performance Monitor/Optimizer User Manual page 123

Table of Contents

Advertisement

Scheduled Movement
Displays only logical disks that are schedule to be moved.
The Movement Progress Information is updated according to the interval time specified in the environment
definition of the iSM. For the check interval, refer to Chapter 5 "Installation of Performance Optimization
Function".
After completion of logical disk movement, the relation between the logical disk and the RANK changes. This
configuration change is detected by the iSM simultaneously with the completion of the transfer and is reflected on
the state monitoring screen of the iSM as well as on the NEC Storage PerformanceOptimizer screen.
(3) Exceptional Operations
After the transfer of a logical disk has started or the movement schedule has registered, there is a possibility of
canceling the movement, changing the speed and changing (canceling) the movement schedule for some reason.
Canceling the movement
A wrong logical disk has been moved.
Changing the speed
The transfer speed will be changed to "high" because the disk has to be moved as soon as possible.
The speed setting will be changed to "auto" because the business system is greatly affected by the
maximum speed.
Changing (canceling) movement schedule
Due to circumstances that does not allow executing a move at a scheduled time, movement start time must
be changed or registered movement schedule must be canceled.
As described above, interrupting disk movement, changing movement speed, and changing (canceling) movement
schedule are unusual operations. For such exceptional operations, the screen allows interrupting disk movement,
changing movement speed, and changing (canceling) movement schedule. However, pay extra attention in
operations of interrupting disk movement, changing movement speed, and changing (canceling) movement
schedule. These operations are allowed for users of L2 level or higher only.
The following describes the procedures for stopping movement, changing movement speed, and changing
(canceling) movement schedule.
Canceling LD movement
(i) Select a logical disk to stop the movement
Click the logical disk you want to stop its transfer from the Movement Progress Information Display
Area.
(ii) Displaying the Stop LD Movement dialog
Three types of procedures are available for displaying the Stop LD Movement dialog. Use any one of
them to display the Stop LD Movement dialog screen.
Popup menu
Perform right-clicking to display the popup menu, and then click [Stop LD Movement] from the
popup menu.
Menu
Click [Operation] and then click [Stop LD Movement] from the menu.
Chapter 6 Operation of Performance Optimization Function (GUI)
II-41

Advertisement

Table of Contents
loading

Table of Contents