Download Print this page

GE CV936 Owner's Manual & Installation Instructions page 16

Vented range hoods

Advertisement

Available languages

Available languages

Installation instructions
iNSTALL CEiLiNG BRACKET
The ceiling
bracket
must
be installed
when
the duct
cover is used to span 24" or more
height
above
the
hood.
The bracket
will hold
the decorative
duct cover
in place
at the top.
Note:
The ceiling
bracket
is not required
when
using
only the ]2" section
of the duct cover.
* Install
the 2 small screws
into the sides of the duct
bracket.
Remove
the screws.
Pre-tapping
the boles
will insure
ease of final installation.
* Match
center
notch
on the bracket
to the centerline
on the wall and flush
against
the ceiling.
* Mark
the 2 screw hole locations.
* Drill
1/8"
pilot boles
in marked
bracket
location.
* If pilot boles
do not enter
studs,
enlarge
the boles
to
3/8"
and
install
wall fastener
anchors.
* Secure
the bracket
to the rear wall with wood
screws
and washers.
Use wall anchors
if needed.
Note: Bracket has 2 sets of holes. Use larger hobs for wall
fasteners or wood screws with washers. Usesmaller holes for
wood screws with washers.
Install
CeilingBracket _
'
i4!
"-.
When Duct
,'"
Coveris
Usedto Span
24" or More
See Step 9
to Install
Duct Cover
CONNECT
DUCTWORK
* Push
duct
over the end
of the transition
until it
reaches
the stop tabs.
* Install
ductwork,
making
connections
in direction
of
airflow
as illustrated.
* Secure
joints
in ductwork
with sheetmeml
screws.
* Wrap all duct joints
with duct rope for an airdght
seal.
* Use duct rope to seal the flange
connection.
HouseDuctworl<
DuctTape
OverSeam
andScrew
DuctTape
Onlyfor Proper
Operation
of Damper
/_//
f
DuctTape J
OverFlange
_Air
Flow
Screw
Ductworl<
Duct
Stops
\
sition
ACAUTION"
[] Do not use sheet
metal
screws at the transition
to duct_,vork
connection.
Doing
so will prevent
proper
damper
operations.
Seal connection
with rope only.
16

Advertisement

loading