Craftsman 486.24469 Operator's Manual page 6

Professional poly cart
Table of Contents

Advertisement

STEP 7:
(SEE FIGURE 7)
*
Slide hitch into slot at end of tongue and secure with
a 3/8 × 1" he× bolt and 3/8" nylock nut.
*
Assemble hitch pin to hitch bracket and tongue and
secure with a hair cotter pin.
HITCH PiN
3/8 X 1"
HEX BOLT
\
!
!
I
!
!
I
HITCH
I
I BRACKET
3/8" NYLOCK NUT
I
HAiR COTTER PiN _
I
-%
FIGURE 7
STEP 9:
(SEE FIGURE 9)
*
Attach the tool tray lid to the front of the cart,
snapping the plastic posts of lid into the holes in the
cart.
*
Slide the tailgate down into the slots located at the
rear of the cart.
TAILGATE
TOOL TRAY LiD
\
FIGURE 9
STEP 8:
(SEE FIGURE 8)
*
Attach the tool tray to the front of the cart bed using
three 1/4" x 1" hex bolts, 1/4" washers and 1/4"
nylock nuts. Tighten.
1/4" WASHER _
/
1/4" NYLOCK
NUT
FIGURE 8
STEP 10:
(SEE FIGURE 10)
*
Slide a 5/16 x 2-1/2" carriage bolt into the ends of the
rails.
*
Fasten the rails to the cart with the assembled
carriage bolts and four 5/16" washers, 5/16" lock
washers and 5/16" hex nut.
CARRIAGE
BOLT
/
_.._ 5/16" LOCK WASHER
I
I
5/16" HEX NUT
I
6
FIGURE 10
Call 1-866-576-8388
for missing parts or assembly help
DO NOT RETURN TO STORE

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents