Craftsman ZT 7000 Operator's Manual page 9

2-bin bagger
Hide thumbs Also See for ZT 7000:
Table of Contents

Advertisement

Available languages

Available languages

A_ Notches in Bag support
B, Rubber Loop Strap
C, Groove in Upper Tube
Assembly
D, Support
E, Upper Tube Assembly
F. Lower Tube
Figure 9. Upper Tube Assembly Installation (Hopper Top Not Shown for Clarity.)
Figure 1Oi Upper Tube to Bag Support installation
A: Notches !n Bag support
B: Rubber Loop Strap
C: Groove in Upper Tube Assembly
Di Support
Figure 11. Bag Installation
A, Bag Support Hoops
B, Bag Hoops
C, Bag
D, White Bar
E; Up_ TubeAssembly
Bag Installation
Tube Installation
1. Set upper tube assembly (E, Figures g & 10) into bag
support (D) so that upper tube assembly groove (C)
rests ir support (D). Pull rubber loop strap (B)
t_roug_ groove ard secure into rotc_ (A).
2. Slide upper tube assembly (E, Figure 9) otto lower
tube (F).
1. Irstall bag (C, Figure 11) wit_ white bar (C) toward
the rear. Set bag hoops (B) on bag support hoops
(A) as showr.
Repeat for other side.
Closing and Opening
the Hopper
1. To ircrease ease of openirg ard closirg hopper
press latc_ located beneat_ certer of _opper lid.
IMPORTANT:
Reconnect spark plug before attemptirg
to start ZT Rider.

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

107.24907

Table of Contents