Carriage Bolt, 5/16-18; Locknut - Craftsman ZT 7000 Operator's Manual

2-bin bagger
Hide thumbs Also See for ZT 7000:
Table of Contents

Advertisement

Available languages

Available languages

BAFFLE INSTALLATION
1. Lift side discharge chute (H, Figure 3).
2. Insert baffle (F) through discharge opening and poso-
tion baffle into place.
3. Tighten carriage bolts (A) and nuts (E) on baffle (F).
4. Tighten carriage bolt (B) and nut (E) on baffle (F).
5. Position baffle (G) into place.
6. Tighten carriage bolts (C) and nuts (E) on baffle (G).
7. Tighten carriage bolts (D) and nuts (E) on baffle (G).
A. Carriage
Bolts,
5/16-18 x 718
B. Carriage
Bolt,
5/16-18 x 718
C. Carriage Bolts,
5/16-18 x 718
D. Carriage Bolts,
5/16-18 x 718
E. Locknut, 5/16-18
F. Right Hand Baffle
G. Left Hand Baffle
H. Discharge Chute
Figure 3. Baffle Assembly

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

107.24907

Table of Contents