Base - Craftsman 17125455 Operating Instructions Manual

Industrial dovetail jig
Table of Contents

Advertisement

ASSEMBLY
OF THE
TOP
STOP
BLOCKS
TO THE
DOVETAIL
BASE
• The top stop blocks are assembled
to the top of the
dovetail
base in one of two ways depending
upon which
style of dovetail
joint is to be cut:
a HALF-BLIND
FLUSH JOINTS--The
"A" on the stop
block faces toward
the "middle
of the base"
b HALF-BLIND
RABBET
JOiNTS--The
"B" on the
stop block faces toward the "middle
of the base"
c THROUGH
JOINTS---The
"A" on the stop block
faces toward the "middle
of the base"
, Since the flush joint is the more commonly
used joint, the
following
instructions apply to the assembly
of the stop
blocks for this style joint
1 Position
the dovetait
Jig right side up on a flat surface
2 Assemble
one of the top stop blocks to the top surface
of the base using a #10-32 x 7/8" long flathead
machine
screw, as shown
in Figure
t6 The screw threads
into the
hole in the bottom of the slot
3 Make sure that the "A" faces the "middte
of the base"
4 Make sure the open rib portion
of the stop block fits into
the slot in the top surface
of the base
5 Assemble
the remaining
top stop block to the opposite
end of the base in the same manner
6 Again make sure that the "A" faces the "middle of the
base"
7 Tighten
both screws securely
8 To reposition
the stop blocks for rabbet joints,
simpty
loosen the screws just enough
so that the dbs on the stop
blocks come out of the slot The stop block is then rotated
180 ° to the attemate
position,
so the "B" faces the middle
of the base, and securefy
retighten
the screws
FIGURE
16
#10-32 X 7/8" LONG FLAT HEAD \
MACHINE SCREW
\
TOP STOP BLOCK
RIB ON STOP BLOCK ,
\\
#10-32 X 7/8" LONG FLAT
MACHINE SCREW
RIB ON STOP BLOCK
/'
SLOT IN TOP //
OF BASE
SLOT IN TO P
OF BASE
BASE
ASSEMBLY
OF THE CLAMPING
KNOBS TO THE
DOVETAIL
BASE
1 Assemble 11/32" ID x 7/8" O D washers onto the 5/!6-
18 bolts at both ends of the dovetail base as shown in
Figure 17.
2 Assemble the clamping knobs onto the bolts as shown
FIGURE
17
5/16-18 X 2" LONG ROUND
HEAD SQUARE NECK BOLT
1t132" I D X 7/8"
OD
3 Thread
the clamping
knobs onto the bolts so that the
spacing between
the washer
and the template
supports
is
approximately
1/2"
4 Set the dovetail
base aside for the time being and con-
tinue on with the next section
5/16-18 X 2" LONG ROUND
HEAD SQUARE NECK BOLT
/ CLAMPING
//
KNOB
CLAMPING /
KNOB
14
\
1/2" SPACING BETWEEN
WASHER AND TEMPLATE
SUPPORT (BOTH ENDS)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents