Configuring Stacking - Allied Telesis AT-8000GS/24 Installation Manual

At-8000gs series stackable gigabit ethernet switches
Hide thumbs Also See for AT-8000GS/24:
Table of Contents

Advertisement

Chapter 3: Stacking

Configuring Stacking

40
Configuring stacking is performed during the bootup process. To configure
a device as part of a stack, the bootup process must be interrupted
straight after the Power On Self Test (POST).
To configure the device for stacking, perform the following:
1.
Ensure that the device console is connected to a VT100 terminal device or VT100
terminal emulator.
2.
Deactivate the AC power receptacle.
3.
Connect the device to the AC receptacle.
4.
Activate the AC power receptacle.
When the power is turned on with the local terminal already connected, the switch
goes through POST. POST runs every time the device is initialized and checks
hardware components to determine if the device is fully operational before completely
booting. If a critical problem is detected, the program flow stops. If POST passes
successfully, a valid executable image is loaded into RAM. POST messages are
displayed on the terminal and indicate test success or failure.
As the switch boots, the bootup test first counts the device memory availability and
then continues to boot. The following screen is an example of the displayed POST.
------ Performing the Power-On Self Test (POST) ------
UART Channel Loopback Test........................PASS
Testing the System SDRAM..........................PASS
Boot1 Checksum Test...............................PASS
Boot2 Checksum Test...............................PASS
Flash Image Validation Test.......................PASS
BOOT Software Version x.x.x.xx Built 07-Jan-200x 10:53:05
Processor: xxxxxx xxxxx xxxx, xx MByte SDRAM.
I-Cache 8 KB. D-Cache 8 KB. Cache Enabled.
Autoboot in 2 seconds - press RETURN or Esc. to abort and enter prom.
The boot process runs approximately 30 seconds.
The auto-boot message that appears at the end of POST (see the last lines) indicates
that no problems were encountered during boot.
5.
Suspend the startup process by pressing
following message is displayed:
Autoboot in 2 seconds -press RETURN or Esc.to abort and enter prom.
or
within two seconds and the
<Esc>
<Enter>

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AT-8000GS/24 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

At-8000gs/poeAt-8000gs/48

Table of Contents

Save PDF