Asus ESC4000 G2 User Manual page 28

2u rackmount server
Hide thumbs Also See for ESC4000 G2:
Table of Contents

Advertisement

8.
Push down the right load lever (J),
ensuring that the edge of the load plate
is fixed by the lever (K).
9.
Insert the right load lever under the
retention tab.
10. Push down the left load lever (L),
and then insert the lever under the
retention tab (M).
2-6
J
M
L
Chapter 2: Hardware setup
K

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Esc4000/fdr g2

Table of Contents