Installation; System Preparation; Unpacking; Before Installing - NEC DSX-160 Hardware Manual

Hide thumbs Also See for DSX-160:
Table of Contents

Advertisement

System Preparation

System Preparation

Unpacking

Unpack the equipment and check it against your equipment lists. Inspect for physical damage. If you are not
sure about a component's function, review Components (page 1). Contact your Sales Representative if you
have additional questions.
Have the appropriate tools for the job on hand, including: a test set, a punch down tool and a digital voltmeter.

Before Installing

Make sure you have a building plan showing the location of the common equipment, extensions, the telco
demarcation and earth ground. In addition, the installation site must meet the requirements outlined in the
Standard Practices Manual.

Site Requirements

The common equipment is contained in the wall-mounted Main Equipment Cabinet. Choose a central location
for the cabinet that allows enough space for the equipment — and provides enough room for you to comfortably
work. Figure 1: Installation Layout, DSX-80 (page 22) and Figure 2: Installation Layout, DSX-160 (page 23)
show you about how much space your system requires.
DSX-80/160 Hardware Manual

Installation

Installation ◆ 21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dsx-80DsxDsx40

Table of Contents