Synchronization Detail Chart - Honeywell MPA2C3 User Manual

Access control unit
Hide thumbs Also See for MPA2C3:
Table of Contents

Advertisement

Step 4.
IMPORTANT: In order to proceed to Step #5 please wait for the Secondary panel
to be synchronized. Refer to the "Synchronization Detail Chart"
Note: The RS-485 Secondary panels will automatically register with the primary panel and
for Ethernet Virtual Loop (EVL) a manual registration is required.
Step 5.
(If a backup hadn't been performed the Panel-specific Data will need to be re-pro-
grammed.)

Synchronization Detail Chart

Synchronization
Primary panel to the Secondary panel synchronization occurs at the time the Sec-
ondary panels are "Registered" with the Primary.
The Synchronization only occurs at the time of panel registration and will include
Common Data.
The Secondary panel will reboot after synchronization.
Example:
Primary to Secondary Synchronization in following order with (3) Secondary Pan-
els:
1. The 1st Secondary panel will receive the backup and reboot.
2. The 2nd Secondary panel will receive the backup and reboot
3. The 3rd Secondary panel will receive the backup and reboot.
Common data includes:
130
• EVL Tab: Menu > Panel Configuration > Advanced > EVL Discovery.
Navigate to the "Advanced" Tab of the primary panel:
RS-485 Installations: The Secondary panel will automatically register with the
Gateway.
Confirm the secondary panels are registered.
EVL Installations: Requires Manual Registration of the Secondary Panel.
Navigate to the EVL Discovery and "Register" the Secondary Panels.
Restore the System Wide Backup and select the "Restore this panel only"
option.
• Refer to the "Restore Entire Loop Detail Chart"
Schedules
Cards
Card Formats
MPA2C3 User Manual

Advertisement

Table of Contents
loading

Table of Contents