Hitachi Central Station EX Installation Manual page 30

Air conditioner managing system
Table of Contents

Advertisement

● If the units and/or address information shown is incorrect, the settings and/or wiring may have been done incorrectly.
Check the settings. Tap [Check connection again] to ensure all unit information is correct.
28
Continue from previous page.
5. Tap [+] or [–] to change panel size.
6
6. Tap [
] to confi rm setting and to
return to register monitoring target
window.
Tap [
] to discard the change and
to return to register monitoring target
window.
5
7. Tap [
] to show menu window.
7
8. Tap [View all unit].
If indoor unit/outdoor unit is selected,
step 9 is shown.
For facility units, step 9 of "■ Setting
external in/output for facility units"
(page 34) is shown.
Connecting states for specifi ed units
8
is shown.
9. Tap the window. Arrows appear.
Tap the arrows to scroll horizontally
10
and vertically in the table. Tap to
verify that the refrigerant cycle,
address and number of units are
correctly shown.
If the units information is not correct,
9
refer to "■ Checking connection
again" (page 29).
10. Tap [
] to return to Register
monitoring target window.
A12124820A

Advertisement

Table of Contents
loading

This manual is also suitable for:

Psc-a128ex3

Table of Contents