Operation

Determine the left and right sides of the machine from
the normal operating position.
Installing and Removing
the Attachment
Refer to the Operator's Manual for the traction unit for
the installation and removal procedure.
Important:
Before installing the attachment,
position the machine on a level surface, ensure
that the mount plates are free of any dirt or debris,
and ensure that the pins rotate freely. If the pins
do not rotate freely, grease them.
Note:
Always use the traction unit to lift and move
the attachment.
WARNING
If you do not fully seat the quick-attach
pins through the attachment mount plate,
the attachment could fall off the machine,
crushing you or bystanders.
Ensure that the quick-attach pins are fully
seated in the attachment mount plate.

Filling the Bucket

1.
Position the bucket level to the ground.
2.
Drive forward and insert the bucket into the pile
of material.
3.
When the bucket is full, drive the machine in
reverse and gently tilt the bucket rearward to
decrease the lifting resistance when you lift the
load.
Important:
Always carry loads close to the
ground; refer to
Transport Position (page

Transport Position

When transporting a load, keep the attachment as
close to the ground as possible, no more than 15 cm
(6 inches) above the ground. Tilt it rearward to keep
the load level.
1. No more than 15 cm (6
inches) above the ground
6).
6
Figure 3
Figure 4
2. Tilt the load rearward
g266856
g240205