Recommended Tools Precautions Before Installation Please give enough allowance for the installation. Ensure that there is room enough for the opening and closing of the bathroom door. Please see diagram below for product placement measurements. Please confirm the location of the sewage outlet and the wax ring as indicated below before installation.
Installation Requirements Minimum static water pressure: 20 psi Maximum static water pressure: 80psi Minimum water flow: 1 Gallon every 10 seconds 115 V power GFCI receptacle within 4’ #1 INSTALLING THE WATER VALVE Option #1: Copper Stubbed Out of Wall (easiest method) 1.
Page 6
Option #2: Using PEX water line (new construction, remodels, and plumber installation. Not recommended without a professional) 1. Shut off water to the house and drain water supply line by opening a nearby faucet. 2. Once the water pressure has reduced and has stopped flowing, cut off the valve or fitting using a pipe cutter.
Page 7
6. Make sure valve is shut off and turn the water back on to check for leaks before setting the toilet in place #2 TOILET INSTALLATION 1. Make a cross mark on the floor drain (see below). 2. Lift the toilet seat, remove the white caps, and remove the screws.
Page 8
4. Make two marks on the side and front of the toilet perpendicular to the sewage outlet. 5. Install the wax ring under the toilet. 6. Using two people, lift the toilet and align the marks on the toilet bowl with the cross marks on the ground. Also confirm the holes in the bottom of the bowl alighn with the closet bolts.
9. Reinstall the top of the toilet back onto the base by tightening the screws and replacing the white caps. #3 INSTALLING THE BATTERY 1. Open the battery box and insert battery. 2. Close the battery box and attach the sticker onto one side of the battery box.
Page 10
4. Peel the other side of the sticker and fix it to the side of the toilet. #4 CONNECT BRAIDED HOSE 1. Connect the braided hose to the angle valve installed on step 1. 2. After tightening by hand, turn the nut ¼ turn with a wrench. 3.
Caulk Application Caulk the bottom edge of the toilet with a mildew-resistant caulk designed for indoor bathroom applications. This will help to keep the bowl in place and give the closet bolts added security and strength. Wait for 24 hours to dry. Remote Installation 1.
Need help?
Do you have a question about the Zentina and is the answer not in the manual?
Questions and answers