Error Messages
Note: To clear an error message, press P.
Error
Error 1
Overflow
Error 2
Invalid
argument
Error 3
Too many
pending
operations
Error 4
Out of range
94
Possible Causes
•
A result is outside the calculator range
(± 9.9999999999999E99).
•
Tried to divide by zero (can occur internally).
•
Tried to compute 1/x when x is zero.
•
Statistics worksheet: a calculation included X or Y
values that are all the same.
•
Tried to compute x! when x is not an integer 0-69.
•
Tried to compute LN of x when x is not > 0.
Tried to compute y x when y < 0 and x is not an
•
integer or the inverse of an integer.
•
Tried to compute
•
Amortization worksheet: tried to compute
, and
PRN
INT
•
Depreciation worksheet: a calculation included
>
.
SAL
CST
•
More than 15 active levels of parentheses were
tried in a calculation.
•
A calculation tried to use more than 8 pending
operations.
•
Amortization worksheet: the value entered for
or
is outside the range 1-9,999.
P2
•
TVM worksheet: the
•
Cash Flow worksheet: the
range 0.5-9,999.
•
Bond worksheet: the
•
Date worksheet: the computed date is outside the
range January 1, 1950 through December 31, 2049.
•
Depreciation worksheet: the value entered for:
declining balance percent 0;
0;
< 0; or
SAL
•
Interest Conversion worksheet: the
•
The
value is outside the range 0-9.
DEC
when x < 0.
x
when
<
.
P2
P1
or
P/Y
C/Y
nn value is outside the
F
RV, CPN
1
13.
M01
M01
Appendix — Reference Information
BAL
value 0.
value _0.
, or
PRI
0;
_ 0;
LIF
YR
value 0.
C/Y
,
P1
<
CST
Need help?
Do you have a question about the BA II PLUS and is the answer not in the manual?
Questions and answers