#1 – INSPECTION
Take all of the parts out of the shipping crate and lay them out.
#2 – TRACKS
Assemble track system and secure loosely with provided nuts & bolts. It is important not to fully
tighten the bolts at this stage. This will be done after the head is assembled and rolled along the
track. It is ideal to assemble the tracks on a solid and level footing that is a minimum of 4" off of
the ground – We recommend you attach the leveling legs to sleepers which we discuss later in the
instruction manual). This will allow for easy cleanup of sawdust from under the tracks and height
adjustment of the log supports and also easier leveling of the track.
Limit Plate (4)
Track A (2)
Log Clamp (2)
1.Install leveling feet and fasteners to the track, and install the sliding tube base on the track,repeat
the above installation until all four are complete
L track:
4
Feet:
12
Sliding tube base:
4
www.tmgindustrial.com
SAWMILL ASSEMBLY
Log Support Assembly (2)
Track B (2)
Feet (12)
08/45
Lo
Log Support Assembly Joint (1)
g
Su
pp
ort
As
se
mb
ly
Joi
nt(
1)
Hexagon flange bolts:
Nuts:
Nuts:
Toll Free:1-877-761-2819
Log
Vertical Short Support (2)
Support
Assembl
y
Joint(1)
Vertical Long Support (2)
Log Support (2)
M10x30
M10
M16
24
8
8
Need help?
Do you have a question about the TMG-PSM30 and is the answer not in the manual?
Questions and answers