INSTALLATION

Physical Installation

Physical Installation
Risk of severe injury or death.
When lifting or moving heavy components, use suitable lifting equipment, in good condition, rated for at least 5 times the
weight of the materials being moved.
Operate the VFD with door closed and locked at all times.
Placing the skid on an uneven location can create a tipping hazard.
Risk of bodily injury or property damage.
Pumps can develop very high pressure in some situations. Always install a pressure relief valve able to pass the full pump
flow.
Install the pressure relief valve near the pressure tank and route to a drain capable of full system flow.
Ensure that the foundation is rated to accommodate the operating weight of the package and that it is sized sufficiently for
the weight and loads the package will experience.
Do not over tighten piping connections on the fittings used to connect the site plumbing to each header as this could dam-
age the equipment and/or headers.
Risk of damage to equipment.
The drive electronics are air-cooled. Do not block fan vents or components may overheat.
Placing the skid on an uneven location can create a tipping hazard.
Do not remove the HMI cover or leave open for extended periods of time. This can result in damage to the screen.
1.
Place skid on a flat, level surface, clear of rocks and debris under the skid.
Refer to
"Environmental Requirements" on page
Refer to
"Lifting" on page
2. If applicable, connect level float switche(s) to the system.
To complete configuration, refer to
3. If applicable, connect a control transducer to the system for autonomous operation into Analog 1 on the
sensor input panel.
Refer to
"Transducer Application Setup" on page
8
7.
6.
"Float Control Configuration" on page
17.
17.