Battery Module

2.3
Left view
(1) Alignment boss
(3) Terminals for battery module cascading
(4) Heat sink
3

Installation Preparations

3.1

Installation Environment Requirements

If a battery module is dropped or violently impacted during installation, it may become
faulty and cannot be used. Using a faulty module will cause safety risks such as cell leakage
and electric shock.
Right view
(2) COM port
(5) Ground points
2.4
AC Parallel Box
(1) Ground point on the door
(2) Ground bar
(4) AC input circuit breaker
(5) N wiring terminal
(6) AC output circuit breaker
5
(3) Cable bags