Concrete curing function

When pipes of floor heating are installed, operation for reinforcing concrete curing is applied. (Period of operation: 23 days)
Entering procedure
1. After turning off the DIP switch K3 (3rd switch of SW03) of control kit (Default ON), turn off and turn on the control kit. The
operation for concrete curing starts automatically. (If blackout occurs and communictation restarts later, operation will
continue.)
2. Temperature of discharge water is controlled as time goes on like below.
[Temp.]
Initial
Classification
Heating
Time
96
Temperature
30
3. Remaining days are displayed on the wired remote controller during operation but key operation is unavailable.
Remaining days are
displayed.
❋ If an error is displayed, concrete curing function does not work.
38
Step raise
72
24
24
24
55
30
35
40
Heating
24
24
144
45
50
55
Concrete Curing
Remaining days:
[Day]
Step down
24
24
24
24
50
45
40
35
Total
(Hour)
24
552