● Wear personal protective equipment and use dedicated insulated tools to avoid
● Do not use wet cloth to clean exposed copper bars or other conductive parts.
● Before performing maintenance, power off the equipment, follow the
Before the equipment is put into operation for the first time, ensure that the
parameters are set correctly by professional personnel. Incorrect parameter
settings may result in noncompliance with local grid connection requirements and
affect the normal operations of the equipment.
3.1 Setting the Physical Layout of the Smart PV
Optimizers
Issue 05 (2023-03-31)
D ANGER
electric shocks or short circuits.
WARNING
instructions on the delayed discharge label, and wait for a period of time as
specified to ensure that the equipment is not energized.
NO TICE
Copyright © Huawei Digital Power Technologies Co., Ltd.
3

System Maintenance

3 System Maintenance