Huawei SUN2000-185KTL-INH0 Quick Manual

Huawei SUN2000-185KTL-INH0 Quick Manual

Hide thumbs Also See for SUN2000-185KTL-INH0:

Advertisement

Quick Links

SUN2000-(175KTL-H0, 185KTL-INH0, 185KTL-H1)
Quick Guide
Issue: 14
Part Number: 31500BWE
Date: 2022-01-20
HUAWEI TECHNOLOGIES CO., LTD.

Advertisement

Table of Contents
loading

Summary of Contents for Huawei SUN2000-185KTL-INH0

  • Page 1 SUN2000-(175KTL-H0, 185KTL-INH0, 185KTL-H1) Quick Guide Issue: 14 Part Number: 31500BWE Date: 2022-01-20 HUAWEI TECHNOLOGIES CO., LTD.
  • Page 2: Product Overview

    • Before installing the device, read the user manual carefully to get familiar with product information and safety precautions. Huawei shall not be liable for any consequences caused by the violation of the storage, transportation, installation, and operation regulations specified in this document and the user manual.
  • Page 3 (1) DC input terminals (controlled by DC SWITCH 1) (2) (Optional) Screw hole for DC switch 1 (3) DC switch 1 (DC SWITCH 1) (4) DC input terminals (controlled by DC SWITCH 2) (5) (Optional) Screw hole for DC switch 2 (6) DC switch 2 (DC SWITCH 2) (7) DC input terminals (controlled by DC SWITCH 3) (8) (Optional) Screw hole for DC switch 3 (9) DC switch 3 (DC SWITCH 3)
  • Page 4: Mounting Bracket Dimensions

    Switch Description Component DC SWITCH The DC switch is ON and can automatically turn off for protection. The DC switch is ON but cannot automatically turn off for protection. The DC switch is OFF. • RESET When the DC switch automatically turns off for protection, the RESET button will be released.
  • Page 5: Installation Requirements

    Installation Requirements If inverters are installed in a place with abundant vegetation, in addition to routine weeding, harden the ground underneath the inverters using cement or gravel (recommended area: 3 m x 2.5 m). Installation Angle Installation Space The clearance at the bottom must meet the requirements on the bending radius of the AC output power cable.
  • Page 6: Installing The Sun2000

    Installing the SUN2000 • The M12x40 bolt assemblies are delivered with the SUN2000. If the bolt assembly length does not meet the installation requirements, prepare M12 bolt assemblies by yourself and use them together with the delivered M12 nuts. • Before installing the mounting bracket, remove the security Torx wrench from the mounting bracket and save it for...
  • Page 7 3. (Optional) Install screws for locking DC switches. For the model used in Australia, perform this step to meet the local standards. 4. Adjust the installation positions of the handles, and install the SUN2000 on the mounting bracket.
  • Page 8: Installing Cables

    Installing Cables Installation Preparations If outdoor copper-core cables are used, select copper wiring terminals. For details about the requirements for cables and terminals of other materials, see the user manual. Item Type Specifications Description PE cable Single-core Conductor cross- • If you choose the outdoor copper sectional area ≥...
  • Page 9 Item Type Specifications Description (Optional) Three-core outdoor • Conductor cross- Power cable of copper cable with sectional area: 10 the tracking dual-layer system protection • Cable outer diameter: 15–18 mm Note a: The value is valid only if the conductors of the PE cable and AC power cable use the same material.
  • Page 10: Installing The Pe Cable

    Installing the PE Cable • It is recommended that the PE cable be connected to a nearby PE point. Connect the PE points of all SUN2000s in the same PV array to ensure equipotential connections to PE cables. • To enhance the corrosion resistance of a ground terminal, you are advised to apply silica gel or paint on it after connecting the PE cable.
  • Page 11 3. Remove the crimping modules that are bound in the maintenance compartment and save them properly for future use. For some models, a three-hole rubber plug is bound in the maintenance compartment. After removing the rubber plug, save it properly for future use. Crimping module (Optional) Replacing the Crimping Module...
  • Page 12 Removing the Rubber Rings from the Crimping Module Use scissors to cut off the joints of the rubber rings to remove them. All rubber rings are removed in the same way. (Optional) Installing the Solar Tracker Power Cable 1. A switch-disconnector-fuse or fuse-switch-disconnector with a voltage of no less than 800 V, current of 16 A, and protection type of gM needs to be installed between the SUN2000 and the tracker controller for protection.
  • Page 13: Installing Ac Output Power Cables

    Installing AC Output Power Cables Remove the corresponding rubber rings in strict accordance with the cable diameter, and ensure • that the crimping module is not damaged. Otherwise the protection level of the solar inverter will be affected. • Ensure that AC terminations provide firm and solid electrical connections. Failing to do so may cause SUN2000 malfunction and damage to its terminal block, even starting thermal events.
  • Page 14 Single-Core Cable The 32–36 mm cable is supported only (five rings) by some models. Refer to the (four rings) corresponding label to get the (three rings) supported size. (two rings) (one ring) Bending Radius Multi-Core Cable Single-Core Cable Unarmored Armored Unarmored Armored R ≥...
  • Page 15: Closing The Maintenance Compartment Door

    Closing the Maintenance Compartment Door Installing DC Input Power Cables Wiring Description of Y-branch Connectors Y-branch connectors can be purchased from Huawei or the manufacturers based on the • following recommended models: If the rated current of the fuse of the Y-branch connector is 15 A, the recommended model is 904095944 (Luxshare) or A040959443039 (Comlink);...
  • Page 16 Number of Number of Y-branch Recommended MPPT to Be Y-branch Recommended MPPT to Be Connector Connected Connector Connected Sets Sets MPPT1 MPPT1 and MPPT4 MPPT1, MPPT3 and MPPT4 MPPT1, MPPT3, MPPT4 and MPPT6 MPPT1, MPPT2, MPPT3, MPPT4, MPPT1, MPPT2, MPPT3, MPPT4, and MPPT5 MPPT5, and MPPT6 MPPT1, MPPT2, MPPT3, MPPT4,...
  • Page 17 B to the SUN2000s. (recommended) Models recommended Part A can be directly connected to the SUN2000, by Huawei and part B is not needed. Connecting Y- To ensure that the terminals of part A match the DC...
  • Page 18 Selecting DC Input Terminals The SUN2000 has three DC switches (DC SWITCH 1, DC SWITCH 2, and DC SWITCH3). DC SWITCH 1 controls routes 1–6 of DC input terminals, DC SWITCH 2 routes 7–12, and DC SWITCH 3 routes 13–18. Select DC input terminals according to the following rules: 1.
  • Page 19 Installing a DC Input Power Cable Positive metal contact Positive connector PV-CZM-41100 Negative (STAUBLI) Click Negative metal contact connector Ensure that the cable cannot be removed after crimped. Use a multimeter Ensure that to measure the the locking Click DC voltage. nut is secured.
  • Page 20 Port Definition Definition Description RS485A IN, RS485 RS485A OUT, RS485 Used for cascading differential signal+ differential signal+ inverters or connecting to RS485-1 devices such as the RS485B, RS485 RS485B, RS485 SmartLogger. differential signal– differential signal– PE, shielding ground PE, shielding ground RS485A, RS485 RS485B, RS485 Used for connecting to...
  • Page 21: Verifying The Installation

    Connecting Communications Cables (4–8 mm Two-Hole Rubber Plug) If three communications cables are to be connected, use the three-hole rubber plug that is bound in the maintenance compartment. Verifying the Installation 1. The SUN2000 is installed correctly and securely. 2. The DC switches and downstream AC switch are OFF. 3.
  • Page 22: Powering On The System

    Powering On the System When LED2 is steady green (meaning that the inverter is grid-tied), do not turn on any DC switch. Otherwise, the inverter may be damaged because the insulation resistance is not detected. • Before turning on the AC switch between the SUN2000 and the power grid, use a multimeter to check that the AC voltage is within the specified range.
  • Page 23 The app is named SUN2000. 2. Go to Huawei app store (https://appstore.huawei.com), search for SUN2000, and download the app installation package. You can also scan Scan the QR the QR code (https://appgallery.cloud.huawei.com/appdl/C10279542) to...
  • Page 24 Bluetooth Module or WLAN Module USB Data Cable Connection Connection Android Android Login Page Select Connection Mode Select User Quick Settings Function Menu • The screenshots in this document correspond to app version 3.2.00.013 (this app is available only on Android phones currently). •...
  • Page 25 Grid Code Mapping Table SUN2000- SUN2000- SUN2000- Grid Code Description 175KTL-H0 185KTL-INH0 185KTL-H1 China medium-voltage CHINA_MV800 Supported power grid G59 medium-voltage power G59-England-MV800 Supported grid Australia medium-voltage AS4777-MV800 Supported power grid India medium-voltage power INDIA-MV800 Supported grid IEC61727 medium-voltage IEC61727-MV800 Supported Supported power grid (50 Hz)
  • Page 26 SUN2000- SUN2000- SUN2000- Grid Code Description 175KTL-H0 185KTL-INH0 185KTL-H1 Dubai medium-voltage DUBAI-MV800 Supported power grid Saudi Arabia medium- SAUDI-MV800 Supported voltage power grid Ireland medium-voltage EN50438_IE-MV800 Supported power grid CLC/TS50549_IE- Ireland medium-voltage Supported MV800 power grid (CLC/TS50549) Northern Ireland- Northern Ireland medium- Supported MV800 voltage power grid...
  • Page 27 SUN2000- SUN2000- SUN2000- Grid Code Description 175KTL-H0 185KTL-INH0 185KTL-H1 Tunisia medium-voltage TUNISIA-MV800 Supported power grid Australia NER standard AUSTRALIA-NER- medium-voltage power Supported MV800 grid VDE4120 standard VDE-AR-N4120_HV800 medium-voltage power Supported grid Nicaragua medium- Nicaragua-MV800 Supported voltage power grid Custom-MV800-50Hz Reserved Supported Spain medium-voltage RD1699/661-MV800...
  • Page 28 Huawei Technologies Co., Ltd. Huawei Industrial Base, Bantian, Longgang, Shenzhen 518129, People's Republic of China solar.huawei.com...