How To Install - Panasonic FV-15CSD1NAH Installation And Operating Instructions Manual

Table of Contents

Advertisement

HOW TO INSTALL

Remove the terminal cover and cord clip.
3
Terminal
Ensure each install plate is at the
5
preliminary position (shown as below) and
insert product into ceiling inclined.
Install hole
Find the "▽" mark on louver, place
7
louver to product aligning the "▽"
to "△" on product.
Product
Louver
Fix the limiting screw.
9
Ensure the tighten
torque in the range
of 20 cN . m to 40 cN . m.
Product may fall off
when torque not
enough, may damage
when torque too large.
Terminal cover
Cord clip
Power cord
Install hole
Ceiling
Install plate
Notice
Set the power cord as below, connect
4
the power cord to terminal and tight
it with cord clip, assemble the terminal
cover.
Turn the install screw of product
6
clockwise till the install plate clamping
to ceiling.
Product
Notice
Ensure the tighten torque in the range
of 60 cN . m to 120 cN . m. Product may
fall off when torque not enough,
may damage when torque too large.
Turn the louver until "▽"align to " "
8
of product and it sounds "Da" means
locked.
Louver
Product
CAUTION
Keep the louver close to the ceiling.
Parts may fall off and result in injury.
Earth wire
Frame
Install
plate
Ceiling
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fv-15csd1

Table of Contents