3 Operation
Instructions 56-8101-02 Edition AE
The valves are controlled from UNICORN.
Storage
Overnight: The valves can be left filled with a buffer.
Overnight and Long time storage: Flush the valves with water and then fill
with 20% ethanol.
Operation 3
7