Perform Field Survey; Set Up The Base System - GE MDS TD220MAX Manual

Hide thumbs Also See for MDS TD220MAX:
Table of Contents

Advertisement

TD220MAX_manual_v11.doc

4.8 Perform Field Survey

4.8.1 Set up the Base System

1.
Set up a Base radio as above, using either a GPS or PTP timing configuration.
2.
Erect a representative antenna system and connect the antenna system to the radio with
representative feedline.
3.
Ensure the radio is supplied with sufficient DC power to accommodate the intended
transmit power setting.
4.
Ensure you have a license to operate the radios and in the configuration settings below,
ensure the frequency setting matches your license.
5.
Run the Poller application on a PC at the fixed base location, setting it up according to the
screen shots below.
6.
Once the Base Radio is set up properly, start polling.
Notes: Set the IP address to that of the Base Radio. Set "GPS Serial Port" to "None" to prevent the
base Poller from attempting to open communications with a GPS receiver. You can set the Receive
on IP Port to any value, because the base Poller will transmit only.
05-6906A01
Page 18 of 49
7/31/2014

Advertisement

Table of Contents
loading

Table of Contents