Download Print this page

Advertisement

Quick Links

MODEL:
GRANGE - 7
PRODUCT SIZE(L x W x H): PLEASE REFER TO PACKING LIST BELOW
PLEASE READ CAREFULLY BEFORE ASSEMBLY
Item No. & Packing List
Product Size
(LxWxH)
AL No.1
400x700x350CM
1CTN
1CTN
800x700x350CM
1200x700x350CM
1CTN
1600x700x350CM
1CTN
etc.
1CTN
Assembly Instructions
AL No.2
AL No.3
AL No.4
1CTN
1CTN
1CTN
1CTN
1CTN
1CTN
1CTN
1CTN
1CTN
1CTN
1CTN
1CTN
1CTN
1CTN
1CTN
Packing List
AL No.5
AL No.6
1CTN
1CTN
1CTN
1CTN
2CTN
2CTN
1CTN
3CTN
3CTN
1CTN
etc.
etc.
1CTN
PC No.1
PC No.2
PC No.3
1CTN
2CTNS
1CTN
4CTNS
1CTN
6CTNS
1CTN
8CTNS
etc.
1CTN

Advertisement

loading
Need help?

Need help?

Do you have a question about the GRANGE-7 and is the answer not in the manual?

Questions and answers

Summary of Contents for Sproutwell GRANGE-7

  • Page 1 Assembly Instructions MODEL: GRANGE - 7 PRODUCT SIZE(L x W x H): PLEASE REFER TO PACKING LIST BELOW PLEASE READ CAREFULLY BEFORE ASSEMBLY Item No. & Packing List Packing List Product Size (LxWxH) AL No.1 AL No.2 AL No.3 AL No.4 AL No.5 AL No.6 PC No.1...
  • Page 2 Assembly and Maintenance Advice 1. For safety purposes, we strongly recommend that the product will be assembled by at least two people. 2. Some parts have sharp edges. Please be careful when handling components. Always wear gloves, shoes and safety goggles during assembly. 3.
  • Page 3 4. The unique design allows the greenhouse to be easily extended at any stage in 4m long sections as detailed in the table of Front Page. 5. A steel base is not required as the aluminium base frame is fixed to the necessary concrete footings with the expansion bolts provided, alternatively you can easily secure it to a timber base with timber screws (not provided).
  • Page 4 POLYCARBONATE ORIENTATION PLEASE NOTE: We have recently changed our polycarbonate film. All panels must be installed with the white film facing inside and the clear film with writing facing the sun. If you have any questions please feel free to contact us.
  • Page 5 ALU. Box No.1 QTY. PART QTY. PART PART QTY. PART QTY. L01A L18A L02C L18B M8x60 J03R/L 1/1 L02D L18C L02F L18D L02G L18E J02R/L 1/1 L02N L18F L02M L16A L03E L16B L03F L16C ∅ 4x10 M6x12 L04A ∅ 3.2x10 L04C L05G ∅...
  • Page 6 ALU. Box No.2 PART PART PART QTY. QTY. QTY. L01A L01B M8X60 J03R/L 1/1 L01C L02C L02D J02R/L 1/1 L02E L02F L02G M6X12 L02N L02M Ø4X16D L03C L03D L04D L04E L05A L05B L08B L08C L08D...
  • Page 7 ALU. Box No.3 PART QTY. L02B L02W L08E ALU. Box No.4 PART QTY. PART QTY. L02A L04B M6X12 L04E M6X20 L05B L05C Ø4X16D L05D Ø5X30 Ø4X10 L15A M8X60 W08A M5X35...
  • Page 8 ALU. Box No.5 (Ext.-4 Section Assembly) PART PART QTY. QTY. L02B L02W L08E L02K L03B ALU. Box No.6 (Ext.-4 Section Assembly) PART PART PART QTY. QTY. QTY. L02A M6X12 L02H M6X20 L03A L04B Ø4X16D L04E Ø5X30 L05B Ø4X10 L05C L05D M8X60 L15A W08A 4...
  • Page 9 PC No.1 PART QTY. No.1 PC No.2 PART QTY. No.2...
  • Page 10 PC No.3 x 2PCS (4 Section Assembly) x 2PCS (Ext.-4 Section Assembly) x 2PCS PART QTY. No.3...
  • Page 11: Front Assembly

    PART PART PART PART QTY. QTY. QTY. QTY. L01A L01B M8X60 J03R/L 1/1 L01C L02C L02D J02R/L 1/1 L02F L02G L02N L02M M6X12 Ø4X10 L03E Ø Front Assembly L03F Ø4X16D Overview L04A L04C L01C L04C L04D L02F L04E L01B L05A L04D L04E L08B...
  • Page 12 PART PART PART PART QTY. QTY. QTY. QTY. L01A L01B M8X60 J03R/L 1/1 L01C L02C L02D J02R/L 1/1 L02E L02F L02G M6X12 L02N L02M Ø4X16D L03C L03D Back Assembly L04D Overview L04E L05A L01C L02E L05B L01B L08B L02F L08C L04D L04E L04E...
  • Page 13: Section Assembly

    W08A 4 L08E M5X35 4 Section Assembly Overview L15A L02B L05D L05D L04B L04B L02W L04B L02B L04E L02B L02B L02W L04E L05B L05C L05C L05B L05C L08E L05C * This page shows how one Grange-7 is assembled, 400x700x350CM. L02A L08E...
  • Page 14 PART PART PART PART QTY. QTY. QTY. QTY. L15A L02A L02B L02W L02H M6X12 L02K M6X20 L03A L03B Ø4X16D L04B Ø5X30 L04E Ø4X10 L05B L05C M8X60 L05D W 08 W08A 4 M5X35 Ext.-4 Section Assembly L08E Overview L05D L02B L05D L04B L02W L02W...
  • Page 15 Expansion screw/Concrete ground * It is crucial the a + b dimensions are the same to ensure the base is square. Support at corners only is not adequate.
  • Page 16 Grange-7 (4 x 7M) Front Assembly Back Assembly 43.4mm Item No. 4 x 7M 8 x 7M 12 x 7M 20 x 7M 16 x 7M Dimensions 7063.8 7063.8 7063.8 7063.8 (mm) 7063.8 (mm) 4059.8 8063.8 12067.8 20075.8 16071.8 (mm) 8147.3...
  • Page 17 Grange-7 + Ext.-4 Section Assembly (8 x 7M) Front Assembly Back Assembly Grange-7 + Ext.-4 Section Assembly * The basic model, Grange-7, can be easily extended by adding a 'Ext.-4 Section Assembly' each time for a longer size.
  • Page 18 Front Back Ext.-4 Section Assembly Grange-7 * This shows a layout for W05's positions where it is placed in the middle of PC panel for each section.
  • Page 19 PART QTY. Door1 Assembly L18A L18B L18C L18C L18D L18E L18F L18A L16A L16B L16C L16C L05G L05G L05G L18B L05H M6x12 Ø5X15 L18C L18C L16C L18A L16C L18A L18B L18B...
  • Page 20 Door2 Assembly L18B L18A L16A L05G L05G L16B L18B L18C L16A L18A L16A L18A L16B L16B...
  • Page 21 Door3 Assembly L18E L18E L18D L18D L18F L05H L05H L18E L18F L05H L05H L18E L18D L18F L18E L18E...
  • Page 22 PART QTY. Roof Vent Assembly L15A L15A M6x20 Ø4X16D Ø4X10...
  • Page 23 L08C L08E L08B L08E L08D L08D L08E L08B L08E L08C L08E L08C L08B&C&D L08C L08E L08B&C&D J03R/L J03R/L L08E L08D L08E L08D L08E L08E J03R/L Assemble all W05 followed by previous Page 16 after each base profile is connected.
  • Page 24 L03C L02M L03D L02N L01A L01A L02N&M L01A L08A L01A L03C&D...
  • Page 25 L02E L02C L02F L02G L02F L02D L05A L02G L05B L05B L05A L03C&D L01A L01A L02G&F L02G L02G L05A L02G&F L05A L05A L02C L02D L03C&D L05A L02F L08C L08D L02E L02C&D&E&M&N L02E L02F&G L05B L05B L08B...
  • Page 26 L03A L02A L02A L03A L02A L02A L02A L02A L02A L02A L02A D&E L03A L01A L03A L02A S01x3pcs L02A L08E L02A...
  • Page 27 L03B L02K L03B L02H L02H Please ensure L02H and L02K profiles are installed back to back and bolted together as shown below on Fig.3 & 4. L03B L02K L02K L02H L02H ∅ Drill 2 holes, 7, through each L02H & L02K profiles as shown on Fig.
  • Page 28 L01A L01A L03B L01A L07 G D&E A&B L01A L03A...
  • Page 29 L05C L02A L05C L05C L05C L05B L05B L05C L02A L05C L05B L03F L02N L03E L05B L02M S01x3pcs L02A L02A L02A L02A L08E L05B L05B L05B L02N&M L05C L03E&F L08C&D L08E...
  • Page 30 L02G L04A L02G L02D L05A L05A L02C L03E&F L01A L01A L02G L02G L02G L05A L05A L04A L03E&F S01x3pcs Slide 3 x S01 into L04A, L04A and tighten L04A at each end with S01. L05A L02C L02D L05A L02C&D&N&M L02G L08D L08C...
  • Page 31 L04C L02F L03E&F L04C L04C L02F L02F L04A...
  • Page 32 L04E L04D L04D L04E L04E L04E L04E L04D L04E L04D Slide 2 x S01 into each L04D & E, and put each profile onto the edge of each PC panel, then tighten all profiles at each end with S01. L04D&E S01x2pcs L04E L04E...
  • Page 33 L01B L01C L01C L01B L01B L01C L01B L01C...
  • Page 34 L01B...
  • Page 35 L02B L02B L02B S01x6pcs L02A L02B...
  • Page 36 L02W L02W L03B L01B&C L02W L02W L02W L02B...
  • Page 37 Roof Vent Assembly Roof Vent Assembly * The roof vents should be lifted through the vent opening from the inside of the greenhouse, then lowered into position from above the greenhouse. So the holes of the L15A line up L15A with the ridge holes.
  • Page 38 Insert all Y6 panels into each side of greenhouse. Note: If it is difficult sliding any panels in the channels, using soapy water or olive oil in the channels can reduce the friction. Insert all Y7 panels into each roof of greenhouse.
  • Page 39 L04B L04B L04B L04B L04B L04B L04B Pay attention to the cut edge of L04B which should be fixed, facing up. L04B L04B S01x2pcs Once the L04B is in place. S01x6pcs Pay attention to the cut edge of L04B A small bead of silicon suitable which should be fixed, facing down.
  • Page 40 L05D L05D L05D L05D Insert all Y9 panels into each roof of greenhouse. Note: If it is difficult sliding any panels in the channels, using soapy water or olive oil in the channels can reduce the friction.
  • Page 41 L04E L04E L04E L04E L04E L04E L04E L04E Once the L04E is in place. A small bead of silicon suitable for polycarbonate can assist in preventing leaks. L04E Insert all Y7 panels into each roof of greenhouse. Note: If it is difficult sliding any panels in the channels, using soapy water or olive oil in the channels can reduce the friction.
  • Page 42 Door2 Assembly Door1 Assembly Door3 Assembly Use L09 to cover the edges of all Y7 after all roof PC panels are fixed in place, then tighten them with Z03. When installing the J06 and the second section of gutter, it can help if you have 2 people, one guiding the gutter into the J06 and the other gently tapping the end of the gutter with a rubber mallet.
  • Page 43 J02R/L J02R/L J02R/L J02R/L To avoid leaking, using silicone on J02R / L, T08 and J07 is an option (see Fig. below). J02R/L Drill one hole on both L01A approx 500mm up from the bottom, Dia. 2.5mm, then tighten J08 with Z02, and push T08 into the channel of J08 (see Fig.
  • Page 44 Once the L09 is in place. A small bead of silicon suitable for polycarbonate can assist in preventing leaks. Z04&S04 L04D Z04&S04 L04D Drill the holes on each L04D as shown, Dia.3.2mm, and secure the hooks W10 with Z04 & S04, then ensure W01 works with Door1 &...