Page 1
Assembly Instructions MODEL:GRANGE - 5 PRODUCT SIZE(400x500x302CM): PLEASE REFER TO PACKING LIST BELOW PLEASE READ CAREFULLY BEFORE ASSEMBLY Item No. & Packing List Packing List Product Size (LxWxH) ALU. No. 1 PC No.1 PC No.2 ALU. No. 2 ALU. No. 3 ALU.
Page 2
Assembly and Maintenance Advice 1. For safety purposes, we strongly recommend that the product will be assembled by at least two people. 2. Some parts have sharp edges. Please be careful when handling components. Always wear gloves, shoes and safety goggles during assembly. 3.
Page 3
4. The unique design allows the greenhouse to be easily extended at any stage in 2m long sections as detailed in the table of Front Page. 5. A steel base is not required as the aluminium base frame is fixed to the necessary concrete footings with the expansion bolts provided, alternatively you can easily secure it to a timber base with timber screws (not provided).
Page 4
POLYCARBONATE ORIENTATION PLEASE NOTE: We have recently changed our polycarbonate film. All panels must be installed with the white film facing inside and the clear film with writing facing the sun. If you have any questions please feel free to contact us.
Page 7
ALU. Box No.4 (2 Section Assembly) PART PART PART PART QTY. QTY. QTY. QTY. L02A L02B L08B L02F L02H M6X12 L15A L02K M6X20 L03A L03B Ø4X16D L04B Ø5X30 L05B L04E W08A 2 Ø4X10 L05C M5X35 L05D M8X60...
Page 8
PC Box No.1 PART QTY. PC Box No.1 PC Box No.2 x 2PCS (2 Section Assembly) PART QTY. PC Box No.2...
Page 9
PART PART PART PART QTY. QTY. QTY. QTY. L01A L01B M8x60 J03R/L 1/1 L01C L02C L02D J02R/L 1/1 L02F L02G L03E L03F Ø4X10 M6x12 L04A Ø3.2X10 L04C Ø4X16D L04D Overview of Front Assembly L05A L08A L01C L08B L04C L02F L01B L04D L04A L01A...
Page 10
PART PART PART PART QTY. QTY. QTY. QTY. L01A L01B M8x60 J03R/L 1/1 L01C L02C L02D J02R/L 1/1 L02E L02F L02G M6x12 L03C L03D Ø4X16D L04D Overview of Back Assembly L04E L05A L05B L01C L02E L08A L02F L01B L08B L04D L04E L01A L04D...
Page 11
PART PART PART QTY. QTY. QTY. PART QTY. L02A L02B L02F L02H M6X12 L02K L03A Ø5X30 L03B L04B M8X60 W08A 4 L04E L05B M5X35 L05C L05D Overview of 4 Section Assembly L05D L02B L08B L03B L04B L02F L02F L04E L02B L05B L02K L03A...
Page 12
PART PART PART QTY. QTY. QTY. PART QTY. L02A L02B L02F L02H M6X12 L02K L03A Ø5X30 L03B L04B M8X60 W08A 2 L04E L05B M5X35 L05C L05D Overview of Middle Section Assembly L05D L02B L08B L03B L04B L02F L02F L04E L02B L05B L02K L03A...
Page 13
10MM Expansion Screw / Concrete Ground * It is crucial the a + b dimensions are the same to ensure the base is square. Support at corners only is not adequate.
Page 14
GRANGE-5 (4 x 5M) Back Assembly Front Assembly 43.4mm 4 Section Assembly Item No. etc. 4 x 5M 6 x 5M 8 x 5M 10 x 5M 12 x 5M 14 x 5M 16 x 5M 18 x 5M Dimensions 5061.8 5061.8 5061.8...
Page 15
GRANGE-5 + 2 Section Assembly (6 x 5M) Front Assembly Back Assembly 2 Section Assembly GRANGE-5 * The basic model, GRANGE-5, can be easily extended by adding a '2 Section Assembly' each time for a longer size.
Page 16
1000 1000 1000 1000 1000 1000 Front Back 2 Section Assembly GRANGE-5 * This shows a layout for W05's positions where it is placed in the middle of PC panel for each section.
Page 32
L04D L04D L04E L04E L04D L04D L04D L04D L04D&E S01x2pcs Slide 2 x S01 into each L04D & E, and put each profile onto the edge of each PC panel, then tighten all profiles at each end with S01.
Page 37
Roof Vent Assembly x 4PCS L15A * The roof vents should be lifted through the vent L15A opening from the inside of the greenhouse, then lowered into position from above the greenhouse. So the holes of the L15A line up with the ridge holes.
Page 38
Insert all Y6 panels into each side of greenhouse. Note: If it is difficult sliding any panels in the channels, using soapy water or olive oil in the channels can reduce the friction. Insert all Y7 panels into each roof of greenhouse.
Page 39
L04B L04B L04E L04E L04B Once the L04B is in place. A small bead of silicon suitable for polycarbonate can assist in preventing leaks. S01x2pcs Pay attention to the cut edge of L04B which should be fixed, facing down. L04E Pay attention to the cut edge of L04E which should be fixed, facing up.
Page 40
L05D L05D Insert all Y9 panels into each roof of greenhouse. Note: If it is difficult sliding any panels in the channels, using soapy water or olive oil in the channels can reduce the friction.
Page 41
Door2 Assembly Door1 Assembly Install the L09 gutter profile over the Door3 Assembly edges of the panels, ensuring the rubber strip seals against the panels. Then fix into place with the Z03 screws, do not over tighten. When installing the J06 and the second section of gutter, it can help if you have 2 people, one guiding the gutter into the J06 and the other gently tapping the end of the gutter with a rubber mallet.
Page 42
J02R/L J02R/L J02R/L J02R/L Once the L09 is in place. A small bead of silicon suitable for polycarbonate can assist in preventing leaks. To avoid leaking, using silicone on J02R / L, T08 and J07 is an option (see Fig. below). J02R/L Drill one hole on both L01A approx 500mm up from the bottom, Dia.
Page 43
Z04& S04 Z04& S04 L04D L04D Drill the holes on each L04D as shown, Dia.3.2mm, and secure the hooks W10 with Z04 & S04, then ensure W01 works with Door1 & 2 & 3 properly when the doors are open.
Need help?
Do you have a question about the GRANGE - 5 and is the answer not in the manual?
Questions and answers