Contents Copyright Copyright of this operation manual remains the property of the company VECOPLAN AG This operation manual is intended for the installation, operation and monitoring personnel of the plant operator. It contains regulations and drawings of a technical nature, which may...
Page 3
We hereby declare that the construction of Shredder VAZ 800 XL SP in the form supplied by us, is intended for installation in a machine and/or for putting together with other machines to form a machine...
Contents 1 Contents Contents ............................4 General ..............................8 Note to the Operator........................8 Usage as Stipulated ........................8 VECOPLAN - Quality Control ...................... 9 Safety...............................10 Symbols.............................10 3.1.1 Occupational Safety.......................10 Occupational Safety Instructions ....................11 3.2.1 Organisational Measures .......................11 3.2.2 Selection and Qualification of Personnel; Fundamental Obligations........11 Safety Instructions for Specific Operating Phases...............12...
Page 5
Contents 4.3.2 Tightening Torques of Screw Connection for Counter Knife............26 Electrical Connections........................27 Noise Emission Values of a Reference Machine.................28 Transporting............................30 Dimensions and Weight (see Chapter "Technical Data").............30 Instructions and Protective Measures for Transporting..............30 Hoisting Gear, Lifting Eye Bolts ....................30 Check on Acceptance by the Receiver ..................31 Packaging, Insulation .........................31 Report and Document Transport Damage ..................31 Storage Location, Storage Period, Protective Measures .............31...
Page 6
Contents 8.6.1 Troubleshooting ........................48 8.6.2 Switching on Again after Fault....................49 Damage during Guarantee Period ....................49 Maintenance ............................50 Maintenance and Inspection.......................50 9.1.1 Instructions ..........................50 9.1.2 General advice hydraulic system....................52 9.1.3 Recommended Hydraulic Oil Type ..................53 9.1.4 Adjusting the Hydraulic System ....................53 9.1.5 Maintenance and Inspection List ....................54 Lubricating and Checking the Bearings..................57...
Page 7
Contents 10.4.7 Main drive ..........................89 10.4.8 Hydraulic system (structural component 6) ................90 10.5 Spare Parts and Customer Service Addresses ................91 10.6 Our Representative Offices ......................92 Appendix ............................94 11.1 Maintenance Tools and Accessories ..................94 11.2 List of Separate Documentation....................94 Trip coupling ...........................95 12.1 Operational Safety ........................95 12.2...
Pos: 7.1 /01 _AL/02 _Bestim mu ngsg emä ße V erwe ndun g/Allg/Je der da rüb er hi naus geh end e Ge bra uch @ 95 \ mod _11 906 339 760 62_ 2.doc @ 1 204 402 Any further usage is deemed not to be as stipulated. VECOPLAN is not liable for damage incurred as a result;...
VECOPLAN - Quality Control Pos: 9.2 /01 _AL/03 _VECOPLAN - Q ualität skont rolle/Allg /Die M aschin e/Anla ge wir d bei VECOPLAN kom plett @ 32 \ mo d10 893_ 2.d oc @ 3163 77 The machine/plant will be completely assembled and the individual parts operationally checked at the VECOPLAN site.
Safety Pos: 11. 6.1 / 02_SI/ 01_SI _Allg/Kapit el_Allg/0 3_Siche rheits hinweis e zu besti mmt en Bet r_Allg/0 3_Siche rhei tshinw eise zu besti mmt en Bet r Ü2 @ 2 7\mo d83 71_ 2.do c @ 2 864 25 Safety Instructions for Specific Operating Phases Pos: 11.
Do not make any alteration to the electrical control system without the written authorisation of VECOPLAN. This also applies to software from PLC control systems. Pos: 11. 8.4 / 02_SI/ 01_SI _Allg/Kapit el_Allg/0 3_Son der arb eiten wi e Ins tan dh_Allg/ 03_ 2_03 _Hyd raulik -Schlauc hleitu nge n @ 2 7\m od8 391 _2.d oc @ 286 867 ...
Page 14
Safety Pos: 11. 8.14 /02 _SI/01 _SI_Allg/Kapi tel_Allg/ 03_So nde rar beite n wie I nsta ndh_Allg /03 _2_1 2_Alle G riffe _ T ritte _ Gel änd er @ 27\ mod 840 1_2. doc @ 28 707 5 Keep all handles, handrails, pedestals, platforms and ladders free from soiling, snow and ice.
Safety Pos: 11. 10.1 /02 _SI/01 _SI_Allg/Kapi tel_Allg/ 04_Hinw eise auf b eson de re G efah ren art en_Allg/ 04_Hinw eise auf beso nde re G efah ren art en Ü2 @ 2 7\mo d84 13_ 2.do c @ 2 875 95 Instructions on Particular Types of Risk Pos: 11.
Safety Pos: 11. 12.1 /02 _SI/01 _SI_Allg/Kapi tel_Allg/ 04_G as_ St aub_ Dam pf_ R auch _Allg/04 _2_ Gas_ St aub _ Da mpf_ Rauc h Ü3 @ 27\ mo d842 1_2 .doc @ 28 764 7 3.4.2 Gas, dust, steam and smoke Pos: 11.
Safety Pos: 11. 18.1 /02 _SI/01 _SI_Allg/Kapi tel_Allg/ 05_O rtsve rän derlic h eins etzb are Masc hine n_Allg/0 5_O rtsve rän derlic h eins etzb are Masc hine n Ü2 @ 27\ mod 843 2_2 .doc @ 28 795 9 Mobile Machines Pos: 11.
Safety Pos: 21. 1.1 / 03_SI/ 02_ 2_XXX_Schutz einric htun gen /Ü2_Sch utzein richt ung en @ 10\ mod 201 9_2. doc @ 11 225 1 Protective Devices Pos: 21. 1.2 /W arn ung _Allg/Allgem eine Gefa hr en/ F_Ü_Wa rnu ng - Allgem eine Gef ahr en_D reieck @ 21 \mo d_1 113 207 599 781_ 2.d oc @ 4317 85 Warning –...
Page 21
Safety Pos: 21. 3.12 /03 _SI/02 _4_ Gefä hrd ungs ber eich/ ZK/VAZ/G efäh rdu ngsb ereic h bei nac h ob en o ffen em Ein fülltric hter @ 8 9 \m od_ 1186 572 627 890 _2.d oc @ 117 099 1 ...
Page 22
Safety Pos: 21. 3.19 /03 _SI/02 _4_ Gefä hrd ungs ber eich/ ZK/VAZ/G efäh rdu ngsb ereic h bei seitlich offe nem Einfüllt richte r @ 89 \ mod_ 118 657 251 262 5_2. doc @ 11 709 29 Dangerous area with filler hopper open on one side Pos: 21.
Safety Pos: 21. 5.1. 1 /03 _SI/0 3_XXX_Restrisik en/R estrisik en_Allg/Ü 2_Rest risike n @ 1 0\m od1 983 _2.d oc @ 111 939 3.10 Residual Risks Pos: 21. 5.1. 2 /03 _SI/0 3_XXX_Restrisik en/R estrisik en_Allg/Es geh en vo n M aschin e/Anla ge Res trisike n aus , wen n @ 13\ mod3 644 _2. doc @ 112 095 There are residual risk from the machine/plant, if Pos: 21.
Technical Data Pos: 40. 1 /0 3_TE/Ka pitel/ 06_Anzi ehd reh mo ment e de r Sch raub en/ ZK/Ü2_ ohn e_Z erkl einer ungsw @ 2 9\m od9 110 _2.d oc @ 135 313 Tightening Moment of the Screw, Except Fixing Screws for Reducing Tools and Counter Knife Pos: 40.
Technical Data Pos: 48 / 03_ TE/Kapit el/08 _Lä rm emissio n/Lä rm emissio nswer te ei ner Refe renz masc hine _VAZ @ 31\m od_ 111 590 537 382 8_2. doc @ 46 9101 Noise Emission Values of a Reference Machine Under consideration of the harmonised standards: DIN EN 12012-3;...
Page 29
Technical Data The following extensions stipulated by CEN – TC 142, in order to obtain a precision class of 3 dB better, were considered: are ≤ 4 dB. The environmental correction factors K or K The difference between the external noise sound pressure level and the noise pressure level at each measurement point is ≥...
Transporting Pos: 50. 1 /0 5_TR /Ü1_ Tra nspo rt @ 2\ mod4 0_2 .doc @ 77 021 Transporting Pos: 50. 2 /0 5_TR /Ü2_Ab mess ung en u nd G ewicht si ehe K ap Tech n Dat en @ 27\ mod 756 0_2. doc @ 77 099 Dimensions and Weight (see Chapter "Technical Data") Pos: 50.
Transporting Warning - General Risks. When selecting hoisting gear, ensure sufficient loading force. Check on Acceptance by the Receiver When accepting the machine/plant, check for visible damage from transporting, particularly to moving parts electrical cables hydraulic lines ...
Pos: 56. 5 /A @ 37\m od_ 112 694 207 395 3_0. doc @ 56 1151 Pos: 56. 6 /0 6_M O/06 _1_ Mon tag e fü r alle Pr odu kte/VECOPLAN e mpfie hlt d ring end, die Mon tage ar beite n @ 2 2\m od7 745 _2.d oc @ 773 07 VECOPLAN urgently recommends that fitting work on the machine/plant is carried out by VECOPLAN expert personnel.
At ambient temperatures of below – 10°C the machine/plant is only conditionally usable. Special heating spirales etc. will be required – please contact the VECOPLAN-Service Department for more information. Observe national laws and regulations of private and public inspection authorities.
Installation Pos: 58. 1 /0 5_M O/06 _2_XXX_M ont age/Ü bers chrift en/Ü 3_M onta ge @ 26\ mo d_11 138 225 860 31_ 2.doc @ 4 395 71 6.4.1 Fitting Pos: 58. 2 /0 5_M O/06 _2_XXX_M ont age/ ZK/Die st atisch e un d dy namisc he @ 29\ mo d87 09_2 .doc @ 2 2597 5 The static and dynamic base load can be seen from the dimensional drawing (see Chapter "Technical Data - Dimensions and Weight").
Pos: 67. 10 / 06_ MO/0 6_3 _Nach de r Mo nta ge_Allg/Sollt en noch Fr age n off en s ein @ 95\ mod _119 064 594 014 0_2. doc @ 12 068 02 If you have any further questions, please contact the installation department of VECOPLAN, to prevent possible errors in assembly. Pos: 68 /S @ 37 \mo d_1 126 9416 242 65_ 0.do c @ 5 611 25...
Installation Brush the threads of metric screw joints and blind stops with jointing compound and tighten well. Then brush over again. Also seal cable entries well. Clean sealing surfaces of terminal boxes and terminal box lid well before reinstallation. Seals must be glued in place on one side.
Initial commissioning has a significant effect on the optimum working of the machine/plant. Because of the number of influencing factors, we urgently recommend taking on VECOPLAN expert personnel for commissioning. This must only not only be done for guarantee reasons, but at the same time: ...
Commissioning Pos: 85. 11 / 06_IN/ 07_ 3_Bei der Inb etrie bna hme /Checklist e/ÜT _Bei d er I nbet rieb nah me ist zu ko ntr olliere n @ 42 \ mod _113 964 388 860 9_2. doc @ 64 466 9 after an The following are to be checked when commissioning: immediately...
Commissioning Pos: 87. 7.1 / 07_IN /07 _6_Ve rrie gelu ngstes ts/Ü3 _Verri egel ungst ests mit Üb ersch rift @ 3 \ mod9 1_2 .doc @ 22 769 1 7.4.2 Locking Mechanism Tests After the idle operation tests have been completed, there needs to be clearance from the locking mechanism tests before electrical and mechanical installation.
Commissioning Pos: 89. 1 /0 7_IN/0 7_7 _M echa nische r Pro bela uf mit Mat erial /Ü2_ Mech anisch er Pr obel auf mit M ate rial @ 10 \ mod2 695 _2. doc @ 128 813 Mechanical Test Running with Material Pos: 89.
Page 43
Pos: 91. 14 / 07_IN/ 07_ 7_ Mech anisch er Pr obel auf mit M ateri al/Bei In bet rieb nah me d urc h VECOPLAN - T echnik er is t @ 3 2\m od1 103 0_2.
Operation Pos: 93. 1 /0 8_BE/Ü1_Bet rieb @ 3\ mo d99_ 2.d oc @ 7741 1 Operation Pos: 93. 2 /0 8_BE/01 _Betrie b Allge mein/N orm aler Betrie b @ 3\m od1 06_2 .doc @ 1 2902 1 Normal Operation The normal switching on and operation of the machine/plant is not different from the procedure described in the "Commissioning"...
All safety devices must be installed before operation. Alterations to the drives are only permitted after written consultation with VECOPLAN. Pos: 95. 1.3 / 08_BE/0 2_Bet riebssic her heit/Au fbau ten auf der Masc hine /Anlage z.B. @ 95\ mod _11 9070 962 614 0_2. doc @ 12 112 33 Add-ons to the machine/plant, e.g.
Operation Pos: 97. 5 /0 8_BE/03 _Bedien ele ment e/Le gen de d er Be dien ungs elem ente ÜT @ 15\ mo d61 33_2 .doc @ 2 2805 5 Legend of controls Description Pos: 97. 6 /0 8_BE/03 _Bedien ele ment e/Z erklei ner er/XXX_VAZ/XXX_Bedie n- und An zeige elem ent e/N/Z _Not -Aus_Sch altet St eue rspa nnu ng a us @ 49\ mod_ 114 715 914 181 2_2. doc @ 70 0803 1 Emergency stop Switches off the control voltage Pos: 97.
If a defect occurs on the machine/plant during the guarantee period, which cannot be attributed to improper treatment, then the plant is to be left in this condition and the damage to be reported to VECOPLAN Service Department. Appropriate measures are then taken by the Service Department after agreement with the operator.
Maintenance Pos: 105 .1 / 09_IH/ Ü1_I nstan dhal tung @ 3\ mo d12 3_2. doc @ 18 8613 Maintenance Pos: 105 .2 / 08_IH/KP/ 01_IH/ 01_Allg emei n/Wa rtun g un d Ins pekti on Hinw eise @ 35\ mod _11 236 854 8495 3_2 .doc @ 53 094 7 Maintenance and Inspection 9.1.1 Instructions...
Page 51
Maintenance Pos: 105 .4 /Wa rnu ng_Allg /Allgem eine Gefa hre n/F _Ü_Wa rnu ng - Allgem eine Gefa hre n_Dr eieck @ 21\ mo d_1 1132 075 997 81_ 2.do c @ 4 317 85 Warning – General Risks! Pos: 105 .5 /Wa rnu ng_Allg /Allgem eine Gefa hre n/W/F _W/F _Wen n Rep ara tursc halte r b etäti gt we rden , da nn @ 36 \mo d_1 125 059 7468 43_ 2.d oc @ 5 416 39 If the repair switch is operated, then this must be secured permanently against switching on (padlock) for the period of the...
Pos: 111 .2 / 08_IH/KP/ 01_IH/ 01_ 1_Hyd raulik /01 _2_Einst ellun g Hydr aulika ggr egat /Das Hy dra ulikag gre gat b etri ebsfe rtig Fac hpe rson al @ 1 7 \m od7 536 _2.d oc @ 207 307 The hydraulic system gets supplied ready for work. Re-adjustments, e.g. after repair, must only be effected by the qualified VECOPLAN personnel.
Maintenance Pos: 113 /08 _IH/KP/01 _IH/0 2_XXX_W I Lis te/Ü3 _War tun gs- u nd I nspe ktionslist e @ 10\ mod1 893 _2. doc @ 796 47 9.1.5 Maintenance and Inspection List Pos: 114 /08 _IH/KP/01 _IH/0 2_XXX_W I Lis te/Ü T_Kon trollst elle- und W art ungs hinweis e @ 1 0\m od1 894 _2.d oc @ 796 73 Control Point and Maintenance Instructions Description Sheet No.
Page 55
Maintenance Pos: 121 /08 _IH/KP/01 _IH/0 2_XXX_W I Lis te/Ü T_Kon trollst elle- und W art ungs hinweis e @ 1 0\m od1 894 _2.d oc @ 796 73 Control Point and Maintenance Instructions Description Sheet No. Firstly Regularly after ... after ...
Page 56
Maintenance Pos: 127 .1 /Vo rsicht - Besc hädig ung des Ger ätes/ F_Ü _Vorsich t - Bes chä digun g de s Ge räte s @ 2 4\m od_ 111 321 0864 531 _2. doc @ 431 837 Caution - Equipment Damage! Pos: 127 .2 /Vo rsicht - Besc hädig ung des Ger ätes/B/ F_B/ F_Bei Eins atz vo n Kühlg er äten, Lüf ter n, Klima ger äten @ 3 5 \m od_1 122 300 252 968 _2.d oc @ 516 315 When using cooling equipment, ventilators, air conditioner etc.
Maintenance Pos: 132 .1 / 08_IH/KP/ 01_IH/ 03_Sc hmie run g/03 _Schmi eru ng u nd Ü ber prüf ung de r La ger /Ü2_Sch mier ung und Übe rpr üfun g d er L age r @ 38 \ mod _113 195 820 450 0_2. doc @ 59 147 9 Lubricating and Checking the Bearings Pos: 132 .2 / 08_IH/KP/ 01_IH/ 03_Sc hmie run g/03 _Schmi eru ng u nd Ü...
Maintenance Pos: 136 .1 / 08_IH/KP/ 01_IH/ 03_Sc hmie run g/03 _2_XXX_Schst /KP/02_ Tab elle/Ü T_Sch mierst ellen Ta belle @ 6\ mod 3427 _2. doc @ 208 087 Pos. No of Located at Total filling Expected Re-grease Inspection No.: amount re-filling intervals...
Pos: 140 .3 / 08_IH/KP/ 02_IS/ Fü r Inst ands etzu ngsa rbeit en empf ehle n wir @ 7\ mod 542 9_2. doc @ 208 477 VECOPLAN recommends to employ the qualified VECOPLAN service crew for repairs. Therefore, your maintenance personnel obtain the opportunity for intensive training.
When starting to run the VECOPLAN machine/plant with a new V-belt set, after around 4-5 h run-in time, the V-belt tension is to be checked; the belts are to be re-tensioned in the same way.
Maintenance Pos: 144 .1 / 08_IH/KP/ 02_IS/KP/0 4_2 _XXX_Keilriem en sp ann en u nd w echsel n/Ü3_K eilripp enri eme n sp anne n u nd wec hseln @ 4 8\m od_ 1145 629 468 796 _2.d oc @ 691 985 9.3.3 Tension and Replace V-ribbed belt Pos: 144 .2 /Wa rnu ng_Allg /Allgem eine Gefa hre n/F _Ü_Wa rnu ng - Allgem eine Gefa hre n_Dr eieck @ 21\ mo d_1 1132 075 997 81_ 2.do c @ 4 317 85...
Page 63
Maintenance Pos: 144 .15 /08_ IH/KP/02_ IS/KP/04_ 2_XXX_Keilrie men s pan nen und wechs eln/Keilri eme nsch utz d emo ntier en @ 7 \ mod 345 1_2. doc @ 208 867 Remove V-belt protection Pos: 144 .16 /08_ IH/KP/02_ IS/KP/04_ 2_XXX_Keilrie men s pan nen und wechs eln/ Moto r-Bef estig ungssc hra ube n löse n @ 48\ mod _114 537 262 367 1_2. doc @ 69 029 7 ...
Maintenance Pos: 146 .1 / 08_IH/KP/ 02_IS/KP/0 4_4 _Dem onta ge und Mon tag e Keilrie mens cheib e/Ü3 _Dem onta ge und Mon tag e Keilrie mens cheib e @ 7\m od54 54_ 2.d oc @ 2 099 59 9.3.4 Removing and Fitting Pulley Pos: 146 .2 /Wa rnu ng_Allg /Allgem eine Gefa hre n/F _Ü_Wa rnu ng - Allgem eine Gefa hre n_Dr eieck @ 21\ mo d_1 1132 075 997 81_ 2.do c @ 4 317 85...
Page 67
Maintenance Pos: 148 .28 /08_ IH/KP/02_ IS/KP/ZK/ZKW/0 5_Wec hsel/Sec hska ntsch r löse n un d mit Scheib en h er ausn eh @ 7 \m od4 993 _2.d oc @ 166 799 Loosen hexagon screws and take out with washers. Pos: 148 .29 /A @ 37 \mo d_1 126 942 073 953_ 0.d oc @ 5611 51 Pos: 148 .30 /Vorsich t - Bes chädi gun g de s Ge räte s/F _Ü_Vorsic ht - Besch ädigu ng d es G erät es @ 24\ mod _11 132 1086 453 1_2 .doc @ 43 183 7 Caution - Equipment Damage!
Maintenance Pos: 150 .1 / 08_IH/KP/ 02_IS/KP/ ZK/GM -Tr ave rse/ ZK/06 _1_G M-W echsel/Ü 3_G ege nmes serw echsel @ 3\ mod 168 _2.d oc @ 210 817 9.3.6 Replace Counter Knife Pos: 150 .2 /Wa rnu ng_Allg /Allgem eine Gefa hre n/F _Ü_Wa rnu ng - Allgem eine Gefa hre n_Dr eieck @ 21\ mo d_1 1132 075 997 81_ 2.do c @ 4 317 85 Warning –...
Page 69
Maintenance After replacement of the counter knife turn rotor by hand with corresponding tool, in order to be sure, that no reducing tool knocks against the counter knife. Pos: 150 .18 /Absatzz eiche n @ 2 8\m od_ 111 501 092 2250 _2. doc @ 456 583 Pos: 150 .19 /Hinweis/ F_Hinw eis_Ü...
Maintenance Pos: 154 .1 / 08_IH/KP/ 02_IS/KP/ ZK/Schieb erfü hru ng/Schi ebe rfüh run g_ Lauf rollenw echs el Ü @ 7\m od17 37_ 2.d oc @ 2 123 25 9.3.8 Ram guides: Replacing of guide rollers Pos: 154 .2 /Wa rnu ng_Allg /Allgem eine Gefa hre n/F _Ü_Wa rnu ng - Allgem eine Gefa hre n_Dr eieck @ 21\ mo d_1 1132 075 997 81_ 2.do c @ 4 317 85 Warning –...
Page 72
Maintenance Pos: 154 .16 /08_ IH/KP/02_ IS/KP/ZK/Schie berf ühr ung/Sic her ungs ring und Lau frolle ab neh men @ 7\ mod 547 6_2 .doc @ 21 248 1 Remove snap ring and take off guide roller. Pos: 154 .17 /08_ IH/KP/02_ IS/KP/ZK/Schie berf ühr ung/N eue La ufroll e au fziehe n @ 7 \m od5 477_ 2.d oc @ 2125 07 ...
Maintenance Pos: 158 .1 / 08_IH/KP/ 02_IS/KP/ ZK/Wechsel Abstr eifer /1_Schi ebe r/Wech sel d er Abst reif er a m Schie ber Ü @ 7 \mo d11 40_ 2.doc @ 2 141 45 9.3.10 Replacing the Seals at the Ram Front Pos: 158 .2 /Wa rnu ng_Allg /Allgem eine Gefa hre n/F _Ü_Wa rnu ng - Allgem eine Gefa hre n_Dr eieck @ 21\ mo d_1 1132 075 997 81_ 2.do c @ 4 317 85 Warning –...
Page 76
Maintenance Pos: 158 .15 /08_ IH/KP/02_ IS/KP/ZK/Wechs el Abst reife r/1 _Schieb er/Sec hskan tmut ter n löse n @ 7\m od5 508_ 2.d oc @ 2141 97 Loosen hexagon nuts. Pos: 158 .16 /08_ IH/KP/02_ IS/KP/ZK/Wechs el Abst reife r/1 _Schieb er/Sch eiben , Dru ckfed ern un d Hülse n ab ziehe n @ 7\m od55 09_ 2.d oc @ 2 142 75 ...
Maintenance Pos: 160 .1 / 08_IH/KP/ 02_IS/KP/ ZK/Wechsel Abstr eifer /2_R ückwan d/Wech sel d er Abst reif er a n de r Rüc kwand Ü @ 7\mo d11 45_ 2.do c @ 2 144 05 9.3.11 Replacing the Seal at the Back Wall Pos: 160 .2 /Wa rnu ng_Allg /Allgem eine Gefa hre n/F _Ü_Wa rnu ng - Allgem eine Gefa hre n_Dr eieck @ 21\ mo d_1 1132 075 997 81_ 2.do c @ 4 317 85 Warning –...
Every time you change the tool, assess the wear on the rotor contour. If the rotor body is worn too badly, get into contact with VECOPLAN. Pos: 164 /S @ 3 7\m od_ 112 6941 624 265 _0.d oc @ 561 125...
Spare Parts Holding and Customer Service Pos: 169 .1 / 10_EK/0 3_XXX_Bene nnun g d er Ba uteile/Ü 2_Ben enn ung der Bauteil e @ 27\m od1 020 2_2. doc @ 32 025 1 10.3 Name of Components Pos: 169 .2 / 09_EK/0 3_XXX_Bene nnun g d er Ba uteile/ ZK/VAZ/8 00/XL SP/Ab b @ 4 8\m od_ 114 536 3147 312 _0. doc @ 690 063 Pos: 169 .3 /A @ 37\ mod _11 269 420 739 53_0 .doc @ 5 6115 1 Pos: 169 .4 / Lege nde /Ü_L ege nde @ 10\ mo d26 33_2 .doc @ 1 2535 5 Details:...
Pos: 189 .1 / 10_EK/0 5_EK_Adr essen _Vert retu nge n/Ersa tzteil- und Kund endi ensta dre ssen @ 96 \mo d_1 191 044 0330 62_ 2.d oc @ 1 216 603 10.5 Spare Parts and Customer Service Addresses Our address for the sale of spare parts: Vecoplan AG Ersatzteilabteilung Postfach 1260 D-56464 Bad Marienberg Phone.: 02661/6267...
Appendix Pos: 191 /11 _AH/Ü1_An han g @ 3\mo d20 8_2. doc @ 77 489 11 Appendix Pos: 192 .1 / 10_AH/KP/01 _IH-W erkze uge un d Z ubeh ör/Ü 2_In stan dhalt ungsw erkz eug e un d Z ube hör @ 8 \ mod 395 5_2. doc @ 22 355 7 11.1 Maintenance Tools and Accessories Pos: 192 .2 /Hinw eis/ F_Hinweis _Ü...
Index 13 Index General advice hydraulic system.......52 General Instructions..........32 Adjusting the contaminant detection proximity switch ............97 Adjusting the Hydraulic System......53 Hoisting Gear............33 After Installation ..........35 Hoisting Gear, Lifting Eye Bolts......30 Allen Bradly control ...........47 Hydraulic unit ............25 Appendix ............94 Hydraulics _ Pneumatics........16 Before commissioning........38 Idle Operation and Locking Mechanism Test without Material..........40...
Page 100
Usage as Stipulated........... 8 Replacing the Seal at the Back Wall....77 Replacing the Seals at the Ram Front ....75 Report and Document Transport Damage ..31 V-Belt Drive ............61 Residual Risks..........23 VECOPLAN - Quality Control ......9 Safety ...............10 Warning ............10...
Need help?
Do you have a question about the VAZ 800 XL SP and is the answer not in the manual?
Questions and answers