Hypervolt Home 2.0 7kW AC Installation Manual English designed and manufactured in the United Kingdom...
Page 2
Table of Contents Introduction Safety Information Before the Installation The Installation Procedure Revision 1. Issue date: Feb. 2020 Hypervolt Limited, Unit 17, Innovation Business Centre, Rainham, RM13 8HZ, UK...
Page 3
The Hypervolt Home is designed to only be connected to a dedicated AC supply. The property must comply with minimum BS7671 standards before installation commences.
Page 4
BS8300:2018) 2. Preparing the Hypervolt Unit In order to install the Hypervolt unit you will need access to the main wiring terminal inside the device. Place the unit on a secure surface and using a T20 Security Torx screwdriver, remove the 4 off screws (2 on each side) which secure the front cover in place.
Page 5
Diagram 3 : Disconnect the LED Diagram 4 : Pop out the LED panel. panel. The unit is now ready to be mounted in the desired location. Revision 1. Issue date: Feb. 2020 Hypervolt Limited, Unit 17, Innovation Business Centre, Rainham, RM13 8HZ, UK...
Page 6
7-8mm from the surface of the wall. Refer to Diagram 5. Use the spirit level to adjust the position Drilling Starting Points 7-8mm Diagram 5 Revision 1. Issue date: Feb. 2020 Hypervolt Limited, Unit 17, Innovation Business Centre, Rainham, RM13 8HZ, UK...
Page 7
The Installation Procedure Next, position the Hypervolt and hang it onto the 2 mounting points. Double check that the bottom 2 mounting holes are well aligned and insert the last 2 screws. The unit should now be safely in place.
Page 8
Diagram 8 is provided as a reference for a typical installation diagram for the charging station. The installation should be done in accordance with the applicable local electrical regulations. Diagram 8 Revision 1. Issue date: Feb. 2020 Hypervolt Limited, Unit 17, Innovation Business Centre, Rainham, RM13 8HZ, UK...
Page 9
The Hypervolt Home 2.0 incorporates an automatic thermal based detection mechanism for poor power input connections. You should perform all required electrical tests at this stage. Revision 1. Issue date: Feb. 2020 Hypervolt Limited, Unit 17, Innovation Business Centre, Rainham, RM13 8HZ, UK...
Page 10
4 screws being into place. Diagram 10 (a) Diagram 10 (b) Diagram 10 (c) Diagram 10 (d) Revision 1. Issue date: Feb. 2020 Hypervolt Limited, Unit 17, Innovation Business Centre, Rainham, RM13 8HZ, UK...