Siemens MOBILETT Plus HP Installation And Setting Instructions Manual
Siemens MOBILETT Plus HP Installation And Setting Instructions Manual

Siemens MOBILETT Plus HP Installation And Setting Instructions Manual

Advertisement

Quick Links

MOBILETT Plus HP
Installation and Setting Instructions
Print No.: SPR8-220.033.01.05.02
Replaces: SPR8-220.033.01.04.02
SP
© Sie mens AG 2001
The reproduction, transmission or
use of this document or its contents
is not permitted without express
written authority. Offenders will be
liable for damages. All rights,
including rights created by patent
grant or registration of a utility
model
_or_ design,_are_
reserved.
English
Doc. Gen. Date: 05.01
65 90 579

Advertisement

Table of Contents
loading

Summary of Contents for Siemens MOBILETT Plus HP

  • Page 1 MOBILETT Plus HP Installation and Setting Instructions © Sie mens AG 2001 The reproduction, transmission or use of this document or its contents is not permitted without express written authority. Offenders will be liable for damages. All rights, including rights created by patent...
  • Page 2 0 - 2 Revision Chapter Page Revision MOBILETT Plus HP SPR8-220.033.01 Page 2 of 4 Siemens-Elema AB Rev. 05 05.01 SPS-UD Solna, Sweden...
  • Page 3: Table Of Contents

    List of compatible components ......2 - 10 3 _______Test certificate, MOBILETT Plus HP _______________________________ 3 - 1...
  • Page 4 0 - 4 Contents This page intentionally left blank. MOBILETT Plus HP SPR8-220.033.01 Page 4 of 4 Siemens-Elema AB Rev. 05 05.01 SPS-UD Solna, Sweden...
  • Page 5: Training Of Customer Support Engineers

    Training of customer support engineers Due to the technology, used in this equipment, the setup, service and maintenance is only allowed to be performed by a customer support engineer with a Work Permit for MOBILETT Plus HP. Text emphasis WARNING “Warnings”...
  • Page 6: Required Documents

    (works with the filter comparison method) • Protective ground/earth meter • Equivalent leakage current meter • Storage oscilloscope with ± 2.5 % accuracy • Dose meter MOBILETT Plus HP SPR8-220.033.01 Page 2 of 8 Siemens-Elema AB Rev. 05 05.01 SPS-UD Solna, Sweden...
  • Page 7: Safety Information And Protective Measures

    - the product-specific safety information in the documents, - as well as the general safety information contained in ARTD Part 2. • Connect the MOBILETT Plus HP only to line voltage (receptacle), that corresponds to the installation requirements of VDE 0107 or country-specific regulations. •...
  • Page 8: Protective Measures Batteries B10 And Capacitors In Power Conversion Unit M10 And M11

    Remove the system upper cover. • Discharge the capacitors in M10 and M11 with S10 (D7) (refer to Fig. 1). • Wait 5 minutes; then remove the left, right and front covers. MOBILETT Plus HP SPR8-220.033.01 Page 4 of 8 Siemens-Elema AB Rev. 05 05.01...
  • Page 9 - Check whether the voltage increases. - Switch the system OFF, disconnect the line voltage cable and switch S10 on. Check whether the voltage decreases. Siemens-Elema AB SPR8-220.033.01 Page 5 of 8 MOBILETT Plus HP Solna, Sweden Rev. 05 05.01 SPS-UD...
  • Page 10 In this case, use the Service Instructions to guide you in trouble- shooting. Use caution when performing measurements at the capacitors in M10 and M11. Use only the specified measurement devices (350 V DC). MOBILETT Plus HP SPR8-220.033.01 Page 6 of 8 Siemens-Elema AB Rev. 05 05.01...
  • Page 11: General Information

    Required measurements can be partially transferred from the test protocol provided. Supply schedule 1 crate: L = 1360 mm B = 780 mm H = 1860 mm Weight: gross approx MOBILETT Plus HP 370 kg (Technical documents enclosed) Siemens-Elema AB SPR8-220.033.01 Page 7 of 8 MOBILETT Plus HP Solna, Sweden Rev.
  • Page 12 1 - 8 General This page intentionally left blank. MOBILETT Plus HP SPR8-220.033.01 Page 8 of 8 Siemens-Elema AB Rev. 05 05.01 SPS-UD Solna, Sweden...
  • Page 13: Unpacking, Applying Warning Labels

    Check the unit for cracks, fractures or other damages. • Make sure that neither the single tank nor the collimator has any mechanical defects which would impair the radiation protection. Siemens-Elema AB SPR8-220.033.01 Page 1 of 10 MOBILETT Plus HP Solna, Sweden Rev. 05 05.01 SPS-UD...
  • Page 14: Dhhs Checks

    If the formation status is OK, the "Ready" light indicator lights up in approximately 2 minutes. Continue with chapter "Function check". If error message "CAL 19" or "Err 17" appear on the display, see chapter "Capacitor formation". MOBILETT Plus HP SPR8-220.033.01 Page 2 of 10 Siemens-Elema AB Rev. 05 05.01...
  • Page 15: Function Check

    Use a screwdriver and adjust the speed by potentiometer on D101: - turn clockwise (CW) for slower speed. - turn counterclockwise (CCW) for faster speed. NOTICE This will effect the slow/fast speed simultaneously. Siemens-Elema AB SPR8-220.033.01 Page 3 of 10 MOBILETT Plus HP Solna, Sweden Rev. 05 05.01 SPS-UD...
  • Page 16: Capacitor Formation (If Necessary)

    If the formation is successfully finished the display will show: kVmAs CAP150 = 150 Volt. Duration: Approximately 100 minutes. • Switch "1" of S1 on D1 to "OFF" MOBILETT Plus HP SPR8-220.033.01 Page 4 of 10 Siemens-Elema AB Rev. 05 05.01...
  • Page 17: Check The Indicators And Control Buttons

    • Check the function of the remote exposure switch system according to chapter functional check of "Installation Instructions: Installation of remote exposure switch system". Siemens-Elema AB SPR8-220.033.01 Page 5 of 10 MOBILETT Plus HP Solna, Sweden Rev. 05 05.01 SPS-UD...
  • Page 18: Test Of Kv-Accuracy

    Place the measurement detector on a table or other. Using the light field, set the detector in the beam projection, see fig. 4. • Set the SID to approx. 50 cm (20"). The SID may vary between different kV-meters. Fig. 4 MOBILETT Plus HP SPR8-220.033.01 Page 6 of 10 Siemens-Elema AB Rev. 05 05.01...
  • Page 19: Check The Arm- And Single Tank Movement

    • Press lamp button to store value and leave program. • Switch "1" of S1 on D1 to "OFF". • Check the chosen values. Siemens-Elema AB SPR8-220.033.01 Page 7 of 10 MOBILETT Plus HP Solna, Sweden Rev. 05 05.01 SPS-UD...
  • Page 20: Check The Turn Plate

    Mark the four corners with coins and mark one of the corners with two coins, see fig. 6. • Set 52 kV, 2.0 mAs on the control panel. • Trigger an exposure. MOBILETT Plus HP SPR8-220.033.01 Page 8 of 10 Siemens-Elema AB Rev. 05 05.01...
  • Page 21: Measurement Of Protective Ground Wire

    The value "first measured" has to be entered in the test certificate at the end of the instal- lation and setting instructions. Siemens-Elema AB SPR8-220.033.01 Page 9 of 10 MOBILETT Plus HP Solna, Sweden Rev. 05 05.01 SPS-UD...
  • Page 22: Repeat Measurements

    List of compatible components Component Part No. Single tank (new) 60 77 379 X037E Single tank (repaired) 61 85 172 X037E Collimator (new) 63 17 775 X037E MOBILETT Plus HP SPR8-220.033.01 Page 10 of 10 Siemens-Elema AB Rev. 05 05.01 SPS-UD Solna, Sweden...
  • Page 23 Test certificate, MOBILETT Plus HP 3 - 1 This test certificate is subdivided by analogy to installation and adjustment instruction. This test certificate shall be completed in duplicate, one copy remaining with the client, the other to be filed at the branch office.
  • Page 24 3 - 2 Test certificate, MOBILETT Plus HP Check for reproducibility Fluctuation coefficient C: ........Measurement device Type: ......... Serial No.: ......Date calibrated: ....Check the arm- and single tank movement Check the turn plate Check the brake Light field relative to the x-ray field (A+C)x100% = ......
  • Page 25 Fig.1 and Fig. 2 improved Chap. 2 Page 2 Information change in chapter "Charging of batteries". Page 3 Information change regarding motor drive speed. Siemens-Elema AB SPR8-220.033.01 Page 1 of 2 MOBILETT Plus HP Solna, Sweden Rev. 05 05.01 SPS-UD...
  • Page 26 4 - 2 Changes to previous version This page intentionally left blank. MOBILETT Plus HP SPR8-220.033.01 Page 2 of 2 Siemens-Elema AB Rev. 05 05.01 SPS-UD Solna, Sweden...

Table of Contents