Download Print this page

Checking After The Installation - Huawei FAT9102SD-32G Quick Installation Manual

Advertisement

6 Sealing the Case
Close the FAT cover, buckle the FAT, use the key to lock the FAT, and close the buckle cap. The installation is completed.

7 Checking After the Installation

No.
1
Verify that all bolts and screw s are fastened.
2
Verify that the diameter of the optical cable is matched w ith the inner diameter of the optical cable aperture.
Verify that optical cables are secured reliably.
3
Verify that optical fibers are neatly routed and properly secured using optical fiber straps.
4
Verify that optical fibers are correctly routed.
5
Verify that the bending radius of pigtails is greater than or equal to 30 mm and the pigtails are properly
6
secured using protection straps.
Verify that the box door can be opened and closed easily. Adjust the door if necessary.
7
Verify that the box is properly sealed.
8
Keep the box key carefully.
9
T o ensure that the FAT is locked, verify that the small arrow on the lock
points to LO CK.
Description
Administration Building, Huawei Technologies Co., Ltd., Bantian, Longgang
9
Huawei Technologies Co., Ltd
District, Shenzhen, P. R. China
Postal code: 518129
www.huawei.com

Advertisement

loading