2 Leading in, Stripping, Securing and Coiling Distribution Cable
Adjust the position of the distribution cable so that the stripping point is 60 mm aw ay from the sealing block. Secure the aramid
fiber and then secure the distribution cable on the binding slot using cable ties.
60 mm
Turn over the fiber distribution panel back and secure the loose tube on the binding slot using the cable tie. Route the bare
fibers of optical cable into splicing tray 1 and coil fibers according to the routing in the follow ing figure. Only tw o cores are
spliced w ith the pigtails corresponding to the input pigtails of the SPL.
T he stripping point of the loose tube cannot exceed the line corresponding to the Tube End on the fiber spool board.
Splicing tray 1
Cable ties
4
When securing the aramid fiber, wind it
around the fastener by at least one turn.
After securing the aramid fiber, cut off
the extra aramid fiber.
Tube End
Cable tie
Fiber spool
board