ABB HT576676 Operation Manual page 72

Table of Contents

Advertisement

NOTICE
WARNING
CAUTION
WARNING
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPL65-A32 / -A33 / -A36 + TPL69-A32 / -A33
Maintenance
Cleaning components mechanically
Heating the liquid
To shorten the soaking time the liquid can be heated to maximum
60 ºC.
Heating up of cleaning agents and operating fluids
When cleaning agents or operating fluids are heated up, explosive va-
pours can be produced which are hazardous to health.
Observe the information in the material safety data sheet.
Wear a respiratory mask according to material safety data sheet.
Water and contamination in the cartridge group
If water or contamination gets into the cartridge group, the turbocharger
function may be impaired and parts in the cartridge group may be dam-
aged.
Place cartridge group on suitable wooden or metal supports.
Allow the layers of contamination on the turbine to soak for at least
four hours.
Removing contamination
Health hazard due to soot particles
If soot particles enter the eyes or respiratory tract, this can be harmful
to health.
Avoid the formation of dust.
Vacuum up dust with a suitable vacuum cleaner.
Wear a respiratory mask to protect against particles (P1 or P2 mask).
Wear safety goggles.
Wear safety goggles.
Wear a respiratory mask to protect against particles.
Wear safety gloves against mechanical risks.
Raise the cartridge group and align horizontally.
5
5.5
Page 70

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tpl65-a32

Table of Contents