Installation Steps; Equipment Location; Equipment Mounting; Equipment Grounding - Mitsubishi Electric C&C Power BC29 Installation, Operation & Maintenance Manual

Battery cabinet
Table of Contents

Advertisement

7.2 I
S
NSTALLATION
TEPS
Before installing or maintaining this system, it is extremely important to read this
manual and be sure that all system drawings and schematics are reviewed and
clearly understood. If there are any questions concerning this manual or any of the
installation or maintenance procedures and/or requirements please contact a C&C
Power representative before proceeding.
7.2.1 E
L
QUIPMENT
OCATION
Prior to installation, verify floor loading requirements and all applicable codes pertaining to the
related equipment. Environmental conditions should also be reviewed. Battery systems require
an area with proper ventilation and cooling. An ambient temperature between 20°C to 25°C
(68°F to 77°F) is recommended for optimum battery life and performance. The cabinet has vent
holes located at the front and rear of the system. Never install the cabinet into a sealed
enclosure. Clearance around the equipment should be as suggested by NEC and/or all applicable
national and local codes.
Under certain conditions, batteries can vent potentially explosive gas (hydrogen).
Never enclose batteries or battery cabinets in a sealed room.
7.2.2 E
M
QUIPMENT
OUNTING
Battery cabinet systems are extremely heavy. Use a minimum of two people when
unloading and setting equipment in place.
1. The BC29 battery cabinet is equipped with four casters, two swivel types in front and two
rigid types in the back. Move the cabinet into the desired location and lock the front casters.
2. Lower the four leveling feet located at each corner to stabilize the cabinet and prevent it
from moving.
7.2.3 E
G
QUIPMENT
ROUNDING
All system ground wires should be derived from the main building ground source.
For multi cabinet systems, each cabinet needs to have a designated cabinet ground
wire derived from the main building ground source.
Terminate a cabinet ground wire from the main building ground source to the supplied #6-
300MCM mechanical lug located on the breaker pan. See section 6.2 for sizing recommendations.
Wire should be sized per NEC and/or all applicable national and local codes.
4/16/2014
15