Tighten the screws on the copper bars or cables to the torque specified in this
document. Loose connections will result in excessive voltage drops or cause
battery modules to burn out when the current is high.
● Do not open the front cover of a battery module when moving it.
● Do not hoist or move battery modules by using battery wiring terminals.
● Ensure that lithium batteries are from the same manufacturer and of the same
● Install the battery modules from bottom to top and from left to right to
● Place the batteries correctly to prevent vibrations and shocks.
● Before installing batteries, carefully read the electrical safety precautions.
● After tightening the screws, the operator needs to mark the screws. After
Step 1 Clean the cabinet and ensure that there is no foreign matter, dust, or scraps in the
cabinet.
Step 2 Pull out the BCU for about 10 cm.
Figure 4-56 Pulling out the BCU
Step 3 Install battery modules.
Issue 10 (2022-04-30)
D ANGER
CA UTION
model. Batteries of the same batch are recommended.
prevent falling over due to imbalance.
NO TICE
completing the inspection, the inspector needs to mark the screws in a
different color.
Copyright © Huawei Technologies Co., Ltd.
4 Installation and Cable Connection
77

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SmartLi 2.0 and is the answer not in the manual?

Questions and answers

Table of Contents