Page 2
: / /www. p ol y j o hn. c om/pc- 0 00570/ http: / /www. p ol y j o hn. c om/ph03- 0 008r/ PH03-0008R - Roof PC-000570 Fly Screen http://www.polyjohn.com/pc-000100/ (28) PC-000100 - Rivet http://www.polyjohn.com/pc-000100/ PC-000100 - Rivet http://www.polyjohn.com/pc-000106/...
Page 4
: / /www. p ol y j o hn. c om/sg1- 0 013c/ SG1-0013C - Flapper Complete Contains the following parts http: / /www. p ol y j o hn. c om/PC- 0 00233/ PC-000233 http://www.polyjohn.com/sg1-0013/ SG1-0013 - Flapper Valve Nylon Lock Nut http://www.polyjohn.com/pc-100620/ PC-100620...
Page 5
: / /www. p ol y j o hn. c om/sg1- 0 013c/ SG1-0013C - Flapper Complete http: / /www. p ol y j o hn. c om/ch100- 0 60/ CH100-060 Contains the following parts http://www.polyjohn.com/sg1-0013/ SG1-0013 - Flapper Valve Discharge Hose, 1” x 60” http://www.polyjohn.com/pc-100620/ PC-100620 - Counterweight http://www.polyjohn.com/pc-000106/...
FULL SIZE SCALE FASTENER DRAWINGS (12) PC-000105 Rivet (123) PC-000106 (113) PC-000100 Rivet Small Flange Washer Large Flange, Short 3/16” Back-up (1) PC-000117 Rivet (4) PC-000102 Rivet Hollow Wall 3/4” Grip (29) PC-000123 Washer Small Flange, Short 1/4” x 5/8” Flat (3) PC-000104 Rivet (1) PC-000122 Screw Small Flange, Long...
Page 8
ASSEMBLY INSTRUCTIONS These assembly instructions are for foot flush and hand flush, recirculating and fresh flush systems. Some steps will not be needed for your particular configuration. Step 1. Foot Flush Pump Assembly for Recirculating and Fresh Flush (Continue to step 2 for Hand Flush Place a PC-000352 hose clamp on the end of a 60”...
Page 9
Step 3. Front Sub-Assembly to the Base Surrounds Lift the front sub-assembly and place the legs of the aluminum door jamb into the “pockets” of the base surround on each side of the door opening. Attach the front assembly to the front corner moldings by riveting into the pre-drilled holes using (18) PC-000100 rivets and (18) PC-000106 back-up washers as in Step 1.
Step 4. Attaching the Wall Panels and Corner Moldings to the Base Surround For the side panels: Place a PC-000121 washer on a PC-000139 bolt and insert the bolt though the center hole in the left side panel and into the base surround.
Page 11
Step 6a. Foot Flush Waste Tank Installation Place the waste tank into position and insert the two hoses coming from the foot pump into the two holes in the back rib of the tank. Locate the discharge hose (the hose coming from the right side hole) and place a PC- 000352 clamp on the end.
Page 12
Step 8. Vent Stack Installation Slide the vent stack up through the 4” hole of the roof and down into the corresponding hole in the tank. Using a 13/64” drill bit, drill a hole through the boss on the tank and through the vent stack.
Page 13
Step 11. Sink Installation For Fresh Flush Sink: Place the sink assembly into the corner and tilt Two holes on right side, located 13-1/2” from right vertical rib. Top the sink out so that the intake hose coming from the tank can be con- hole 3”...
Page 14
Step 14. Toilet Paper Dispenser The double roll dispenser can be mounted in a location of your prefer- ence based upon the accessories you have in the unit. Level the dis- penser on the wall and use the four holes in the back of the dispenser as a guide to mark the location for drill holes.
Association International. Contact your area sales representative for further details. OUR MISSION STATEMENT “PolyJohn is a family owned, state of the art, plastics manufacturing company dedicated to providing its employees with a work environment committed to excellence, and its customers with innovative products, services and technology that meet or exceed their requirements.”...
Need help?
Do you have a question about the Comfort XLT PH04 and is the answer not in the manual?
Questions and answers