ABB A200-L Operation Manual page 103

Turbocharger
Hide thumbs Also See for A200-L:
Table of Contents

Advertisement

Operation Manual / A200-L
9 Disassembly and assembly / 9.20 Fitting wall insert
7. Move the wall insert fully in and remove the guide studs. Fit the remaining threaded
studs. Observe tightening torque. Leave the top threaded hole (x) in the compressor cas-
ing empty.
8. Check that 23 threaded studs have been fitted.
9. Press the wall insert into the compressor casing using a hexagon nut (72004) and sleeve
(90191). Observe tightening torque. Remove nuts and sleeves.
© Copyright 2021 ABB. All rights reserved.
HZTL4036_EN
Rev.T
December 2021

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

A255-lA260-lA265-lA270-lA275-lA280-l ... Show all

Table of Contents