®
Installation and Operation Manual BEKOKAT
5.8
Re-commissioning after shut down
If the BEKOKAT
®
is only put back into operation after a long downtime, proceed as with initial
commissioning.
®
Check, particularly after maintenance or repair, if the BEKOKAT
is fully piped and electrically
connected. If not, then initiate a correct installation.
V01 /11-046
67 / 88