10
CSLD Troubleshooting
I61101
MAY
7, 1999 10:13 AM
LEAK
TEST
TEST
TANK
METHOD TYPE
----
-----
----
8
CSLD
PER.
9
NONE
Analysis
Tanks 8 and 9 were manifolded and programmed as manifolded. However, the leak test frequency selected for
Tank 9 was not CSLD. The CSLD program was only using Tank 8's volume to perform the test. When Tank 9 was
filling, Tank 8's LRATE was positive.
Solution
Set Tank 9's Leak Test Method to CSLD and delete tank 8 and 9 rate tables.
CSLD PROBLEM 11 - PERIODIC TEST FAIL TANK 2
Diagnostics
200
Site ID
Site ID
Site ID
NOV 16, 1999
1:06 PM
TANK
PRODUCT
1
REGULAR
2
PLUS
3
SUPREME
__
76687IA5100_
IA5100
NOV 16, 1999
1:06 PM
CSLD DIAGNOSTICS: RATE TABLE
T 2:PLUS
TIME ST
LRT AVTMP TPTMP BDTMP
9910181409
3 -1.252
9910181537
6 -0.824
9910190355
1 -0.464
9910192324
3 -0.132
9910200241
3 -0.152
TEST
<------START TEST TIME------>
TEST
START
HOURS METHOD YEAR
----- ------ ----
AUTO
CSLD
GALLONS
INCHES
8543
61.99
3705
32.53
6024
46.50
High 90s inconsistent with other tanks.
98.7
97.2
98.9
99.2
97.2
98.9
91.4
96.5
98.9
96.6
96.9
98.9 -0.21
96.0
96.6
98.9 -0.13
MONTH DAY OCCUR
HH:MM
----- --- -----
-----
WATER
DEG F
0.0
77.4
0.0
85.2
0.0
80.4
TMRT DSPNS
VOL INTVL
0.36
734
601
50.0
0.39
582
599 142.0
0.28
432
2783
14.0
898
1474
52.5
753
1445 143.5
10-37
Actual CSLD Test Problems Analyzed
ULLAGE
3139
7977
5658
DEL ULLG THPT
26.5
717
2.4
28.0
717
2.4
9.1
572
2.4
28.6
646
2.4
31.9
648
2.4