Download Print this page

Huawei UPS5000-H Series Quick Manual page 4

100 kva power modules, three-phase three-wire
Hide thumbs Also See for UPS5000-H Series:

Advertisement

UPS5000-H-(1200 kVA-1600 kVA) Quick Guide (100 kVA Power Modules, Three-Phase Three-Wire)
Securing the Cabinets (1600 kVA)
Power cabinet 1
Power cabinet 2
Bypass cabinet
unit: mm
A: mounting holes on the channel
steel
B: mounting holes on the floor
Inductor cabinet
M12 bolt
Spring washer
Flat washer
Expansion sleeve
Expansion nut
Concrete floor
4
Before combining cabinets, remove
the screws preinstalled on the copper
bars in power cabinet 2. Store them
properly for future use.
Remove the rear door of
power cabinet 1 when
installing cabinet
combination screws in the
middle at the rear.
Installing rectifiers in the inductor cabinet.
Rectifiers are delivered separately, and
baffle plates are placed in the fitting bag
of the inductor cabinet.

Advertisement

loading

This manual is also suitable for:

Ups5000-h-1200k-ntnUps5000-h-1600k-ntn