A B B devic es Pos: 13 /Busch-Jaeger (Neustruktur)/Modul-Struktur/Online-Dokumentation/Umwelt (--> Für alle Dokumente <--)/Hinweise/Hinweis - Umwelt - ABB Elektrogeräte @ 19\mod_1323162745839_15.docx @ 110867 @ @ 1 All packaging materials and devices from ABB bear the markings and test seals for proper disposal. Always dispose of the packaging material and electric devices and their components via the authorized collecting depots and disposal companies.
Operation ABB-Welcome 5.1.2 No c all is pending Fig. 2: F unc tion Press on the top push-button to open the door. Press on the middle push-button to switch on the lighting. Press on the bottom push-button to refuse an incoming call.
Operation ABB-Welcome Pos: 21 /DinA4 - Anleitungen Online/Ueberschriften/2./Geraeteeinstellungen @ 18\mod_1302768847744_15.docx @ 103548 @ 2 @ 1 A djus ting the devic e Pos: 22 /DinA4 - Anleitungen Online/Inhalt/KNX/DoorEntry/83205-AP-xxx/Geraeteeinstellungen - 83205-AP-xxx @ 18\mod_1303207573639_15.docx @ 103632 @ 3 @ 1 Aside from the standard control you can set the device according to your requirements via the push-buttons.
Operation ABB-Welcome Pos: 27 /DinA4 - Anleitungen Online/Inhalt/KNX/DoorEntry/Bedienung/Master/Slave Schalter setzen 83205-AP-xxx @ 19\mod_1310722767914_15.docx @ 107817 @ 3 @ 1 5.2.3 S etting the mas ter/s la ve s witc h Fig. 5: One station in each apartment must be set as "Master". All additional indoor stations in the same apartment must be set as "Slave".
Mounting / Installation ABB-Welcome Pos: 37 /Busch-Jaeger (Neustruktur)/Modul-Struktur/Online-Dokumentation/Überschriften (--> Für alle Dokumente <--)/2. Ebene/M - O/Montage @ 18\mod_1302615960458_15.docx @ 103424 @ 2 @ 1 Mounting Pos: 38.1 /DinA4 - Anleitungen Online/Inhalt/KNX/DoorEntry/83205-AP-xxx/Montage - Module/Montage - Geraet zerlegen -- 83205-AP-xxx @ 19\mod_1322650779664_15.docx @ 110712 @ @ 1 Mounting in 2 flush-mounted sockets according to DIN 49073-1 Fig.
Page 12
Mounting / Installation ABB-Welcome Fig. 7: 2. Fix the bottom of the device to the wall and connect it in accordance with the graphics. The insulated section of the cable end must not be longer than 10 mm. Fig. 8: 3.
Page 13
Mounting / Installation ABB-Welcome Fig. 9: 4. Latch the upper part of the device onto its bottom part. To do this, place the upper side of the device on the lock-in lugs and then press the bottom side onto the bottom part of the device until the clamp catches.
Addressing ABB-Welcome Pos: 40 /DinA4 - Anleitungen Online/Ueberschriften/1./Adressierung @ 18\mod_1302616059553_15.docx @ 103432 @ 1 @ 1 Addressing Pos: 41 /DinA4 - Anleitungen Online/Inhalt/KNX/DoorEntry/Adressierung/Adressierung-Projektierung @ 20\mod_1324287710173_15.docx @ 112353 @ 233333 @ 1 A ddres s ing the s ta tions 8.1.1 P otentiometer Before installing as system, it must must be addressed.
Addressing ABB-Welcome 8.1.5 S etting of the " s tandard outdoor s tation" For several outdoor stations in a system the "standard outdoor station" must be set on the indoor stations. For this the potentiometer STATION is set on the address of the standard outdoor station - between 1 and 4.
Page 16
Addressing ABB-Welcome Fig. 13: Several outdoor stations with identical assignment Des igna tion Main entrance outdoor station Side entrance outdoor station Apartment 01 Apartment 02 Apartment 03 | 0073-1-7515 — 16 —...
Addressing ABB-Welcome Fig. 14: Several outdoor stations with identical assignment Des igna tion Apartment 01 Apartment 02 Outdoor station of the left building Outdoor station of the entrance gate Outdoor station of the right building Apartment 03 Apartment 04 Pos: 42 /DinA4 - Anleitungen Online/Ueberschriften/2./Video zur Adressierung des Geraetes @ 19\mod_1322130240851_15.docx @ 110503 @ 2 @ 1 V ideo for addres s ing the devic e Pos: 43.1 /DinA4 - Anleitungen Online/Inhalt/KNX/DoorEntry/Video-Module/Einleitungen/Einleitung - Adressierung des Geraetes @ 20\mod_1324552270462_15.docx @ 112509 @ @ 1...
Page 18
Addressing ABB-Welcome Pos: 45 /DinA4 - Anleitungen Online/Inhalt/KNX/DoorEntry/Projektierung-Merkblatt/Projektierung-Merkblatt - ABB @ 19\mod_1323176717034_15.docx @ 111044 @ @ 1 Project name: Mounting position for the outdoor station: Floor 02 === Ende der Liste für Textmarke Content === | 0073-1-7515 — 18 —...
Page 19
Busch-Jaeger Elektro GmbH contents of this document without prior notice. The detailed specifications agreed to at the time PO box of ordering apply to all orders. ABB accepts no 58505 Lüdenscheid responsibility for possible errors or incompleteness in this document.