8. Maintenance
8.1 Maintenance Warnings
Electrical supply must be disconnected prior to conducting any maintenance. To supplement, or in addition to, the
stipulations made in the overall project, perform the following:
2.2 bar
Maintance 1
11-11-2018
11-11-2018
Maintance 2
11-11-2018
Maintance 3
11-11-2018
Maintance 4
Maintenance 1 is due
2.2 bar
1 Maintenance is 1 due
Ext
∑ 200 L
8.2 Maintenance schedule
Monthly inspection
30 days
(No Warning Message)
Maintenance 1
365 Days Compressor*, Pressure release valve, Compressor valve 1
Maintenance 2
1825
Days
Maintenance 3
3650
Days
Maintenance 4
584 Days
* See
"5.5 Component parts" on page 14.
Manual Flamcomat MK-U G4
Maintenance due date is shown in menu 4.4.
12%
Maintenance warnings pops-up when date is due. Warning gets stored in the Current errors/warnings list and Error
logbook.
Acknowledging the "maintenance 1 is due" Warning in the Current errors/warnings list is equal to resetting the
12 %
maintenance 1 due date.
Objects, standard scope of supply
Compressor, oil-free [25-28]*
Main vessel [1]*, Auxiliary vessel MK
Clean particle filter *
& Compressor valve 2.[25-28]*
Control unit [35]*, configuration
Main vessel [1}*, auxiliary vessel MK, Compressor module
[25]* & connection assembly[22]*.
Safety valve[22]*
Main vessel [1]*, auxiliary vessel MK
Service activities, measures
Inspect and/or clean filter element [30]*, filter casing [30]* &
Air inlet when dirty (dry installation required)
Drain condensate [34]*; Deaerate water compartment
[10]*(NA. for vessels with flex vent [12]*)
Clean filter element [30]*, filter casing [30]*& Air inlet [30]*
when needed (dry installation required)
Function check. To be carried out manually by trained and
certified personnel. Other inspections can be done during
operation of the device.
Inspect and restore the required settings (overview menu)
Check for leaks at all the connections to the vessel at both
compressed air- and water compartments (visually). Check
externally for damage, deformation or corrosion and restore
operational readiness.
Function check. To be carried out manually by trained
and certified personnel. (DO NOT PRESSURIZE VESSEL TO
SAFETY VALVE LIMITS)
Inspect vessel internally! Consider recurring inspections,
see general safety instructions!
Carry out strength inspection to vessel!
Carry out recurring inspection of electrical equipment!
We reserve the right to change designs and technical specifications of our products.
30