Dell Precision 7920 Owner's Manual page 84

Hide thumbs Also See for Precision 7920:
Table of Contents

Advertisement

Rack Installation
The 2U system requires two people for installation due to its heavier weight.
NOTE:
Installing the system into the rack (option A: Drop-In)
The sliding rails are a "drop-in" design. This means that the system is installed vertically into the rails by inserting the standoffs
on the sides of the system into the "J-slots" in the inner rail members with the rails in the fully extended position. As with all 2U
systems, a minimum of two people are required in order to properly install the system in the rails.
1. Pull the inner rails out of the rack until they lock into place.
Figure 27. Pull out inner rail
2. Locate the rear rail standoff on each side of the system and lower them into the rear J-slots on the slide assemblies.
3. Rotate the system downward until all the rail standoffs are seated in the J-slots.
84
Disassembly and reassembly

Advertisement

Table of Contents
loading

This manual is also suitable for:

E38s

Table of Contents