Closing The Cover Plate Of An Rru Cabling Cavity - Huawei DBS3900 LTE Installation Manual

Remote radio unit
Hide thumbs Also See for DBS3900 LTE:
Table of Contents

Advertisement

RRU3260
Installation Guide
Figure 9-23 Installing a CPRI fiber optic cable
l To avoid any damage to fiber optic cables, the cables connected to the RRU must be installed
Step 3 Connect the end labeled 2A and 2B of the fiber optic cable to the optical module on the BBU
side.
Step 4 Route the cables according to the instructions in
ties to bind the cables.
Step 5 Label the installed cables according to the instructions in Attaching an L-Shaped Label.
----End

9.12 Closing the Cover Plate of an RRU Cabling Cavity

This section describes the procedure for closing the cover plate of an RRU cabling cavity.
Issue ()
CAUTION
according to the installation process. For details about the installation process, see
Installation
Process.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
9.1 Cabling
Requirements, and then use cable
9 Installing RRU Cables
9.3
116

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dbs3900Rru3260

Table of Contents