Power train

(ALL-C100-001-K-00-A)

Testing swing circle bearing clearance

a Testing tools
Sym-
Part No.
bol
Commercially
J
available
Be careful not to put you hand or foot under
the undercarriage during the test.
Testing
(PC88MR-J117-365-K-00-A)
1. Fix dial gauge J to outer race (1) or inner race
(2) of the swing circle and put the probe to inner
race (2) or outer race (1) on the opposite side.
a Set dial gauge J at the front or rear of the
machine.
2. Set the work equipment in the maximum reach
posture, and set the bucket end to the height of
the under surface of the revolving frame.
a At this time, the front of the upper structure
lowers and the rear rises.
3. Set dial gauge J to the zero point.
4. Set the arm at about a right angle to the ground,
and lower the boom until the track shoe at the
front of the machine rises 150 to 200 mm above
the ground.
a At this time, the front of the upper structure
rises and the rear lowers.
PC88MR-10
Part name
Dial gauge
30 Testing and adjusting
(PC88MR-J117-360-K-00-A)
5. Under this condition, read dial gauge J.
a The value indicated by dial gauge J is the
bearing clearance.
6. Return the machine to the condition in step 2,
and check that dial gauge J indicates 0 point
again.
a If the dial gauge does not indicate 0 point,
repeat steps 3 to 5.