Installation and Operation Manual BEKOKAT
CAUTION
Reactor temperature> + 200 °C
Rise in reactor temperature to> + 200 °C during commissioning
The increase of the reactor temperature to> + 200 °C during
commissioning is not a malfunction.
If the reactor temperature does not drop despite flowing through with
compressed air, then it is a malfunction incident and the system must
be shut down and checked in any case.
Commissioning of the BEKOKAT
approval by authorised skilled technical personnel.
64 / 88
®
®
is only permitted after inspection and
V01 / 11-043