Tests And Periodical Maintenance - GE BUS1000 Instructions Manual

Bus bar protection
Table of Contents

Advertisement

9. 9. 9. 9.
Given the importance of the protection relays in the operation of any equipment, a periodical test program is
recommended.
The interval between periodical tests varies normally for different types of relays, types of equipment as well
as the users' experience on periodical tests.
For systems which are not provided with testing equipment, it is recommended that the points described in
CALIBRATION AND RECEIVING TESTS be checked every 1 or 2 years.
The optional equipment described in previous sections, allows for checking on the correct operation of the
measure and alarm units and of the output elements, without having to remove the protection. In systems
provided with testing equipment, this check can be carried out in short intervals, and does not require
specialised personnel. In this case the frequency of the tests described in RECEIVING AND EQUIPMENT
CALIBRATION can be reduced
GEK-98514B

TESTS AND PERIODICAL MAINTENANCE

TESTS AND PERIODICAL MAINTENANCE
TESTS AND PERIODICAL MAINTENANCE
TESTS AND PERIODICAL MAINTENANCE
BUS1000 Busbar Protection
9. TESTS AND PERIODICAL MAINTENANCE
9-1

Advertisement

Table of Contents
loading

Table of Contents