Installation – Assembly
1.
Install the water system pipes and electric
supply cables in accordance with the relevant
regulations.
2.
Take off the unit's cover: undo the screws,
slide the cover off starting from the inlet and
outlet side.
3.
Fix the unit in vertical position with the inlet
and outlet on the top, or on the bottom, as in
the picture.
4.
Connect (e.g. using flexible hoses) cold water
to the inlet pipe inserting a filter in between
and connect hot water to the outlet pipe.
5.
Open the cold water valve and check for leaks.
6.
Vent the installation according to the „Venting"
section.
7.
Connect the unit to electric installation in ac-
cordance with markings, tighten cable clamp
to secure cable from slipping.
8.
Put the unit's cover back.
9.
Make sure that there is no access to live parts
through the holes at the back plate.
EPO.2 - 3,5
EPO.2 - 4,4
EPO.2 - 5,5/6
Venting
1.
Shut off electric supply.
2.
Open the hot water tap in order to vent the water installation (for about 15-30
seconds), until the flow of water becomes constant and even.
3.
Close the valve.
4.
Switch electric supply on.
Do this each time any pipework has been disrupted.
PL;GB;DE;FR-067B_f.735
flow restriction insert
black 1,9 l/min.
green 2,5 l/min.
violet 3,4 l/min
Installation with the outlet and
inlet pipes on the bottom.
Installation with the outlet and
inlet pipes on the top.
GB
7
Need help?
Do you have a question about the EPO2-3 and is the answer not in the manual?
Questions and answers