Care After Installation - ABB AMA Manual

High voltage process performance motors
Table of Contents

Advertisement

Manual for High Voltage Process Performance Motors

3.7 Care after installation

30 - Installation and Alignment
100 – 250 mm
Rigid Flange
(4 – 10")
Gear
Flexible
250 – 500 mm
Rigid Flange
(10 – 20")
Gear
Flexible
If the machine will not be in operation for a longer period after it has been installed, the same
measures as mentioned above in Chapter 2.5.1 Short term storage (less than 2 months) should
be applied. Remember to rotate the shaft 10 revolutions at least every 3 months, and that self-
lubricated bearings must be filled with oil. If external vibration is present, the shaft coupling
should be opened and suitable rubber blocks should be placed under the feet of the machine.
NOTE: External vibration will damage the bearing rolling surfaces and therefore shorter the
bearing lifetime.
0.02 mm
0.01 mm
(0.8 mil)
(0.4 mil)
0.05 mm
0.03 mm
(2 mil)
(1 mil)
0.10 mm
0.05 mm
(4 mil)
(2 mil)
0.02 mm
0.02 mm
(0.8 mil)
(0.8 mil)
0.05 mm
0.05 mm
(2 mil)
(2 mil)
0.10 mm
0.10 mm
(4 mil)
(4 mil)
3BFP 000 063 R0101 REV D
0.02 mm
(0.8 mil)
0.05 mm
(2 mil)
0.10 mm
(4 mil)
0.02 mm
(0.8 mil)
0.05 mm
(2 mil)
0.10 mm
(4 mil)