Install The Station; Commissioning; Register The Charging Station With Cmp (Optional); Evbox Connect App - EVBox Elvi Installation And User Manual

Fixed cable; part a
Hide thumbs Also See for Elvi:
Table of Contents

Advertisement

EN
this screw.

4.4. Install the station

See the corresponding illustrations in manual B.
No tools or materials are required to install the station.
Note:
The wall dock must be installed before the station can be installed.
Note:
When a wall dock cover has been installed, first remove the wall dock cover using the unlock
tools.
1. Align the station with the wall dock.
2. Press the station evenly onto the wall dock until you hear a 'CLICK'. Press on each corner of the
station to make sure that it is fully engaged with the wall dock.
Make sure that there is no gap between the station and the wall dock.

4.5. Commissioning

You can configure the operation of Elvi using the EVBox Connect app.
Charging stations can be connected to a Charging Management Platform (CMP) or they can be
configured as not-connected installations. Online charging stations connect to the CMP using Wi-Fi or
optional cellular data connection, depending on the model.
The charging station Chargepoint ID and Security code are required for configuration, and these are
located on the accessories folder.

4.5.1. Register the charging station with CMP (optional)

For an online charging station, activate the charging station with the CMP on the CMP website or by
using the CMP-specific app. Contact the Charging Point Operator (CPO) for details about the charging
station activation procedure.

4.5.2. EVBox Connect app

Download and install the EVBox Connect app on your smartphone or tablet:
20
4. INSTALLATION INSTRUCTIONS

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Elvi and is the answer not in the manual?

Questions and answers

Table of Contents