Preparation For Shipping - GE MG-101 User Manual

Field moisture calibration system
Table of Contents

Advertisement

2.2.5 Preparation for Shipping

To ship or to move the MG-101, refer to Figure 7 below and empty the saturator bottle as follows:
1. Remove the rear panel by removing the two small screws at the bottom.
2. Fully open the vent valve by turning it counter-clockwise.
3. Place the end of the fill tubing in a container below the level of the saturator bottle and open the petcock.
4. When the saturator bottle is completely empty, close the petcock and the vent valve, and reinstall the rear panel.
Saturator Bottle
Fill Tubing
Petcock
Screws (2)
MG-101 User's Manual
Figure 7: Emptying the Saturator Bottle
Chapter 2. Setup and Operation
13

Advertisement

Table of Contents
loading

Table of Contents